
-- 101 --
hga1o1ea
4.7
Positioning for welding start (with inductive joint--tracking)
The product must be configured before inductive joint--tracking is possible.
Please refer to ESAB’s service department for configuration.
1. Align the welding equipment into position in relation to the weld joint so that the
working range of the slide cross covers the whole height and lateral deviation of
the joint from starting point to the stopping point for welding.
2. Set the switch in the vertical joint--tracking position
.
3. Position the sensor downwards with the control lever
, until the signal
lamp
goes out.
The equipment now searches for the ideal position itself vertically.
N.B.
If only vertical joint--tracking shall be used, skip the following points.
4. Set the switch in the vertical--right joint--tracking position
.
5. Position the sensor using the control lever
horizontally to the ideal
position until the signal lamp
goes out.
6. Set the switch in the vertical--horizontal joint--tracking position
.
The signal lamp goes out.
The equipment searches for the ideal
position itself horizontally and vertically. If the signal lamp does not go out repeat
the procedure from Step 1.
GB
Содержание GMH
Страница 19: ...99 hga1o1ea X weld Asymmetrical X weld K weld K weld Fillet weld GB...
Страница 25: ...245 schema GMH with portable control box...
Страница 26: ...246 schema GMH Portable control box...
Страница 28: ...248 mskiss...
Страница 29: ...249 mskiss...
Страница 30: ...250 sida...