![ESAB 0558002834 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/esab/0558002834/0558002834_instruction-manual_2424867027.webp)
SECTION 5
TROUBLESHOOTING
27
10 SEC
PUSH
RELEASE
PUSH
RELEASE
TORCH SWITCH
OPEN
CLOSE
GAS SOLENOID VALVE
POSTFLOW
CLOSE
OPEN
FLOW SWITCH
FAULT LIGHT
HF CIRCUIT
INVERTER
CUTTING ARC (CURRENT)
B.
TRIGGER LOCK "LOCK" position
ENERGIZE
NOTES:
1.
When the torch switch is pushed during postflow period, the postflow time is reset, the preflow time is canceled,
and the HF is energized immediately.
2.
When the red fault light comes on, cutting operation should be stopped. The postflow time starts from the moment
the torch switch is released.
3.
FAULT light is on during second "turn-off" trigger only. This does not affect performance in any way.
PREFLOW
Postflow
2 SEC.
Содержание 0558002834
Страница 28: ...28 D 37567 Figure 5 1 Schematic Diagram PCM 1125 208 230V 50 60 Hz 1 and 3 Phase ...
Страница 29: ...29 D 37568 Figure 5 2A Wiring Diagram Sheet 1 of 2 PCM 1125 208 230V 50 60 Hz 1 and 3 Phase ...
Страница 30: ...30 D 37568 Figure 5 2 Wiring Diagram Sheet 2 of 2 PCM 1125 208 230V 50 60 Hz 1 and 3 Phase ...
Страница 31: ...31 D 37569 Figure 5 3 Schematic Diagram PCM 1125 460V 50 60 Hz 3 Phase ...
Страница 32: ...32 D 37570 Figure 5 4A Wiring Diagram Sheet 1 of 2 PCM 1125 460V 50 60 Hz 3 Phase ...
Страница 33: ...33 D 37570 Figure 5 4B Wiring Diagram Sheet 2 of 2 PCM 1125 460V 50 60 Hz 3 Phase ...
Страница 34: ...34 D 37571 Figure 5 5 Schematic Diagram PCM 1125 575V 60 Hz 3 Phase ...
Страница 35: ...35 D 37572 Figure 5 6A Wiring Diagram Sheet 1 of 2 PCM 1125 575V 60 Hz 3 Phase ...
Страница 36: ...36 D 37572 Figure 5 6B Wiring Diagram Sheet 2 of 2 PCM 1125 575V 60 Hz 3 Phase ...