Use and maintenance manual
Sidewall and ropes welding machine
Model: LRBW-150
_______________________________________________________________________________________________________________________
P a g . 1 8
After overlapping the weld and once the profile has cooled, cut it and form the excess to match
the original shape.
Shut the welder down by adjusting the temperature of the Leister to 0 and allowing it to operate
for about 5 minutes to cool the heater element.
NOTE: Not completing this cooling process, that is turning off the blower when the heater
element is still hot, could cause the heater element to fuse because of the increased
temperature inside the tube.
-
Operation for sidewalls:
Remove the ropes welder device, to remove this one, disconnect the air tube and lose the two
handles in both sides:
Disconnect the electrical cable of Leister and air tube, get up the aluminium profile to take away
this rope
’
s device.
After this preparation, assemble the sidewall heads on the support plates and fix the handles: