D02416R04.00
F-PRO 5100 User Manual
3-1
3 Using the IED (Getting Started)
F-PRO Feeder Protection Relay
Offline Mode - Settings Software
Online Mode - Terminal Mode
F-PRO
Feeder Protection
Model 5100
Port 1
Date &
Time
View
Readings
View
Logs
Prev
Next
Target
Clear
Target
1999 JUN 07
Relay Functional
IRIG-B Functional
Service Required
Test Mode
Alarm
Start-up Sequence
The following initialization sequence takes place:
Test Mode—red LED on
2 seconds after power applied
Relay Functional—green LED on
5 seconds after power applied
Front Display—on
30 seconds after power applied
Test Mode—red LED off
40 seconds after power applied
When the relay is powered up, the normal sequence of LED operation is Test
Mode followed by Relay Functional and IRIG-B Functional (if available), dis-
play on, then Test Mode off. The entire sequence takes about 40 seconds.
Ways to interface with F-PRO:
• Front panel display
• Terminal Mode
•
Offliner
Settings software
Содержание F-PRO 5100
Страница 1: ...F PRO Feeder Protection Relay Model 5100 User Manual Version 4 0 Rev 0...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 28: ......
Страница 94: ......
Страница 98: ......
Страница 140: ......
Страница 146: ......
Страница 168: ......
Страница 172: ......
Страница 174: ......
Страница 176: ......
Страница 178: ......
Страница 190: ......