When installation has been completed, the unit is ready to be placed into service. Proceed as follows, while checking 
the unit for any leakages: 
 
1.

 

Place unit in bypass and turn on main water supply; open a cold water tap nearby and allow water to run for a 
few minutes until all foreign material that may have resulted from the installation is washed out; close the tap. 

2.

 

Slowly shift the bypass valve to the service position and secure it; allow water to completely fill the resin tank. 

3.

 

Carefully open a cold water tap and allow water to run for at least 2 minutes to set the resin bed and purge air 
from the unit; close the tap. 

4.

 

Program the control valve according to the specific installation (refer to “Programming” on pg. 10). 

5.

 

Fill the brine tank with water, higher then the air-check level. 

6.

 

Press the 

scroll 

 button until the display shows: 

  

 
 

7.

 

Leave the control valve in this position; the countdown timer will countdown to 0 sec and start a regeneration. 

8.

 

The drain solenoid will be activated and the display will show:  

 

 
 
9.

 

Check the correct functioning of the control valve in the different regeneration cycles; the control valve can be 
advanced to the next regeneration cycle manually by pressing the 

scroll 

 button.  

 

 

541N18 

541N19 

541N94 

541N99 

Action 

Backwash 

Cycle 1 

Cycle 1 

purge air from system 

Brine draw/slow rinse 

Cycle 2 

Cycle 1 

Cycle 2 

Cycle 1 

draw  water  from  the 
brine  tank  until  the 
air check closes  

Fast rinse 

Cycle 3 

Cycle 3 

check  drain  line  for 
flow 

Brine refill 

Cycle 4 

Cycle 2 

allow  water  to  run  to 
brine  tank  for  the 
entire cycle time 

 
10.

 

Add salt to the brine tank. 

 
For 541N18/541N19 only: 
11.

 

As soon as the control valve is back in the service position, place unit in bypass. 

12.

 

Add the appropriate amount of water to the brine tank. 

13.

 

Set float of brine valve to the level of the water in the brine tank. 

14.

 

Shift bypass valve back to the service position. 

 
 

Mixing valve (optional) 

 

To adjust the residual hardness, the incorporated mixing valve must be regulated in function of the hardness of the 
incoming  water  and  the  desired  residual  hardness;  the  scale  on  the  mixing  valve  has  no  absolute  indication,  but 
serves only as a reference point: 

 

To increase the residual hardness: turn screw counter clockwise. 

 

To decrease the residual hardness: turn screw clockwise. 

 
 

Regen in 10 sec 

Rgn:XX  Cyc1:YY

 

 

Содержание 541N Series

Страница 1: ...541N SERIES Technical Manual...

Страница 2: ...id Page 16 Backwash refill solenoid Page 17 Backwash refill solenoid diaphragm Page 17 Valve head Page 17 Injector Page 17 Brine draw restrictor Page 18 Incorporated drain flow control optional Page 1...

Страница 3: ...up through the riser tube the water is conditioned when passing through the resin The throughput is dependent on the maximum permissible pressure drop for the complete water softener and the maximum...

Страница 4: ...120 F 24V 50 Hz max 966 mA 541N18 N94 24V 50 Hz max 676 mA 541N99 24V 50 Hz max 326 mA 541N19 Regeneration Controller software regeneration initiation regeneration mode time of regeneration days overr...

Страница 5: ...541N SERIES Erie Water Treatment Controls Belgium Page 3 Flow Diagrams 541N18 N19 SERVICE BACKWASH 541N18 BRINE DRAW SLOW RINSE FAST RINSE 541N18...

Страница 6: ...541N SERIES Erie Water Treatment Controls Belgium Page 4 Flow Diagrams 541N94 541N99 SERVICE BACKWASH 541N94 BRINE DRAW SLOW RINSE FAST RINSE 541N94 BRINE REFILL...

Страница 7: ...1 2 27 2 27 2 27 3 03 2 27 4 92 5 52 0 30 1 25 0 45 1 25 1 32 1 25 2 08 2 46 2 27 2 84 2 46 3 97 2 46 5 49 6 90 0 30 1 40 0 45 1 40 1 51 1 40 2 08 2 65 2 27 3 03 2 65 4 16 2 65 6 06 The following tabl...

Страница 8: ...Do not install the unit too close to a water heater min 3 m of piping between outlet of unit and inlet of heater water heaters can sometimes transmit heat back down the cold pipe into the control val...

Страница 9: ...ll show 9 Check the correct functioning of the control valve in the different regeneration cycles the control valve can be advanced to the next regeneration cycle manually by pressing the scroll butto...

Страница 10: ...em s size The optimal bed expansion during backwash is generally obtained at a backwash flow of 1 8 L min per dm2 of resin bed surface depending on the type of resin To adjust 1 Place the unit in back...

Страница 11: ...541N SERIES Erie Water Treatment Controls Belgium Page 9...

Страница 12: ...tain the correct time of day during a period of several hours consequently in case of prolonged power failure the time of day might not be maintained if this happens the time of day indication will fl...

Страница 13: ...otal remaining regeneration time the actual regeneration cycle and the remaining cycle time total remaining actual regen remaining regen time cycle cycle time The control valve can be reset to service...

Страница 14: ...proper access code i e key sequence needs to be entered In the programming modes a flashing indication implicates that this parameter can be adjusted by pressing the up button or down button in this t...

Страница 15: ...display will show Press the up button or down button to set the volume of resin 5 Press the scroll button again the display will show Press the up button or down button to set the number of days betwe...

Страница 16: ...ted 9 Press the scroll button again the display will show only when the regeneration mode was set to Delayed or Dlyd Immd Press the up button or down button to set the time of regeneration 10 Press th...

Страница 17: ...ions that have taken place since installation TotVol display shows the total water usage through the unit since installation LastRgn display shows the water usage at the moment of the last regeneratio...

Страница 18: ...using from the bracket 3 Remove the front panel from the timer housing 4 Disconnect all connectors from the PCB 5 Remove the flat cable of the 3 button control pad from the push in connection on the P...

Страница 19: ...heck the diaphragm for rips or tears the diaphragm should have 1 hole in the centre and 2 smaller holes off centre 9 Reverse the procedure for reassembly Valve head 1 Disconnect all connectors from th...

Страница 20: ...rough restrictor 6 Install the check disc on the body stem assembly and the check disc spring onto the centre post of the check disc 7 Install the check ball in the refill cavity of the valve body 8 M...

Страница 21: ...cap grooves 10 Align the mark on top of the back cap with the mark on the valve body and install the back cap with the open end of the check disk spring onto the centre post of the back cap 11 Install...

Страница 22: ...1 Disconnect the flow meter connector from the outlet elbow 2 Unscrew the outlet from the outlet elbow on the control valve 3 Unscrew the outlet elbow from the control valve 4 Pull out the hub from t...

Страница 23: ...541N SERIES Erie Water Treatment Controls Belgium Page 21...

Страница 24: ...electrical service fuse transformer 2 Defective flow meter 2 Clean and or replace flow meter 3 Defective PCB 3 Replace PCB 4 Defective drain solenoid 4 Replace drain solenoid 5 Body stem assembly swit...

Страница 25: ...Cause Solution 1 Improper brine refill time setting 1 Verify that refill time corresponds to salt level and amount of resin 2 Plugged refill flow control 2 Clean flow control Unit uses too much salt C...

Страница 26: ...e increase regeneration frequency 2 Plugged outlet manifold 2 Remove and clean outlet 3 Plugged lower and or upper distributor 3 Verify that distributors are free of debris 4 Crushed lower and or uppe...

Страница 27: ...jector and injector filter 2 Clean out backwash and refill solenoid diaphragm 3 Verify correct functioning of flow meter clean out flow meter if necessary 4 Verify programming of timer re program time...

Страница 28: ...541N SERIES Erie Water Treatment Controls Belgium Page 26 Exploded Views Part Numbers Electronic timer...

Страница 29: ...ain solenoid 8 74019 Gasket drain solenoid 9 74016 Drain line adaptor 10 74018 Nut drain solenoid 11 185 115 1 O ring drain line adaptor 12 541 300 Drain flow control optional 13 72216 Valve head 14 7...

Страница 30: ...541N SERIES Erie Water Treatment Controls Belgium Page 28 Valve body 541N18 ITEM PART NUMBER DESCRIPTION 1 15 91 Screw solenoid 3x 2 413 134 24 Solenoid...

Страница 31: ...25 568 336 0 Brine elbow 26 21 90 Nut brine elbow 27 72467 Union gasket 2x 28 72542 Elbow inlet 29 19 19 Clip drain flow adjuster 30 186 134 O ring drain flow adjuster 2x 31 541 238 Drain flow adjust...

Страница 32: ...541N SERIES Erie Water Treatment Controls Belgium Page 30 Valve body 541N19...

Страница 33: ...72467 Union gasket 2x 21 72542 Elbow inlet 22 19 19 Clip drain flow adjuster 23 186 134 O ring drain flow adjuster 2x 24 541 238 Drain flow adjuster 25 529 244 O ring drain port 26 467 216 Seal body s...

Страница 34: ...ter Treatment Controls Belgium Page 32 Valve body 541N94 ITEM PART NUMBER DESCRIPTION 1 15 90 Screw solenoid 6x 2 413 134 24 Solenoid 3 541 229 Retainer solenoid 4 413 58 Guide solenoid 5 413 62 Sprin...

Страница 35: ...O ring brine plug 28 541 273 Brine plug 29 72467 Union gasket 2x 30 72542 Elbow inlet 31 19 19 Clip drain flow adjuster 32 186 134 O ring drain flow adjuster 2x 33 541 238 Drain flow adjuster 34 529...

Страница 36: ...ter Treatment Controls Belgium Page 34 Valve body 541N99 ITEM PART NUMBER DESCRIPTION 1 15 90 Screw solenoid 4x 2 413 134 24 Solenoid 3 541 229 Retainer solenoid 4 413 58 Guide solenoid 5 413 62 Sprin...

Страница 37: ...O ring brine plug 28 541 273 Brine plug 29 72467 Union gasket 2x 30 72542 Elbow inlet 31 19 19 Clip drain flow adjuster 32 186 134 O ring drain flow adjuster 2x 33 541 238 Drain flow adjuster 34 529...

Страница 38: ...transfo 230 24VAC 24VA EuroT plug R transfo 230 24VAC 24VA UK plug J no transfo I Injector 9 8 5 4 3 2 1 D Incorporated drain flow control 0 no flow control only drain flow adjuster Nr Gal min L min...

Страница 39: ...transfo 230 24VAC 24VA EuroT plug R transfo 230 24VAC 24VA UK plug J no transfo I Injector 9 8 5 4 3 2 1 D Incorporated drain flow control 0 no flow control only drain flow adjuster Nr Gal min L min...

Страница 40: ...transfo 230 24VAC 24VA EuroT plug R transfo 230 24VAC 24VA UK plug J no transfo I Injector 9 8 5 4 3 2 1 D Incorporated drain flow control 0 no flow control only drain flow adjuster Nr Gal min L min...

Страница 41: ...transfo 230 24VAC 24VA EuroT plug R transfo 230 24VAC 24VA UK plug J no transfo I Injector 9 8 5 4 3 2 1 D Incorporated drain flow control 0 no flow control only drain flow adjuster Nr Gal min L min...

Страница 42: ......

Страница 43: ......

Отзывы: