5 of 6
888-01-014-00 rev. F • 09/19
4
5
6
7
300 lb force-inch
(25 lb force-foot)
(34 newton-meters)
TIGHTEN BASE AROUND POST
PLUMB UP THE POST
Floor
Ceiling
SECURE BASE TO SURFACE
400 lb force-inch
(33 lb force-foot)
(45 newton-meters)
MOUNT EQUIPMENT AND ROUTE CABLES
Floor
Ceiling