background image

                                                                                                                                                                     

JA12132021

 

     

                                            

www.epvscreens.com

                      

   U-00222

 

  

         

 

 

Projector Tabletop: 

Make sure the projector (light in) is angled 

(ϴ1)

 to reflect 

(ϴ2)

 at the mirror-opposite 

angle (light out) to align with the viewer’s eye level. 

 

 

 

 

 

 

 

 

 

 

 

Images are not up to scale and are for illustrations purposes only

 

Note

: Improper installation will result in light loss and produce a dark image.  This is due to the projector’s light 

reflecting in the wrong direction. 

 
Installation 

Step 11

Measure the overall length and height of the frame and drill holes for the top brackets. Line up the wall 

brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver. If not 

installing  into  a  structural wood  stud,  use  a  hollow  wall  anchor then  screw  in  the  M5x50  wood  screws with a 

screwdriver. Make sure the brackets are leveled. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model/Size 

X = Wall bracket distance 

X1 = Bracket hole distance 

Y = Top/Bottom Wall Bracket Height 

92” 

1100mm (43.30”) 

30mm (1.18”) 

1180mm (46.46”) 

100” 

1170mm (46.06”)  

30mm (1.18”) 

1280mm (50.39”) 

110” 

1280mm (50.39”) 

30mm (1.18”) 

1410mm (55.51”) 

120” 

1390mm (54.72”) 

30mm (1.18”) 

1530mm (60.24”) 

135” 

1550mm (61.02”) 

30mm (1.18”) 

1720mm (67.72”) 

150” 

1720mm (67.72”) 

30mm (1.18”) 

1900mm (74.80”) 

Don’t lock the screw for 

bottom brackets to allow the 

screen to move up/down. 

j. 

k. 

Diagonal Sizes of 150” and below use 4 x wall brackets

 

Содержание Polar Star Series

Страница 1: ...brightness offer accurate color fidelity and improve contrast levels The Polar Star is best for family rooms educational facilities conference rooms house of worship or any applications in which incid...

Страница 2: ...2 2 2 2 2 b Center Joints D5 top position 2 2 2 2 2 2 c Elbow Joints M4 bottom position 4 4 4 4 4 4 d Elbow Joints D5 top position 4 4 4 4 4 4 g M4x7 Screws 24 24 24 24 24 24 h Spring 56 60 66 72 80...

Страница 3: ...rews g as shown in the illustration below Tip The center joint b with the larger diameter holes should be on top Step 4 Connect the elbow joints c d to the top and bottom sections of the vertical fram...

Страница 4: ...own below Repeat the process for all eyelets Step7 Carefully place the screen on top of the assembled frame as shown below Make sure that the angular edges of the frame are not allowed to come into di...

Страница 5: ...the spring to the hole located on the screen material s outer edge in the following order First connect on four corners steps 1 4 make sure all four corners are fixed before proceeding with next spri...

Страница 6: ...gular Reflective ALR Ambient Light Rejecting Screen Make sure to follow these instructions in order for the CineGrey3D 5D to perform correctly 1 Ambient Light must not come from the same direction as...

Страница 7: ...brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver If not installing into a structural wood stud use a hollow wall anchor then screw in the M5x...

Страница 8: ...tep 12 Position the fixed frame screen onto the top wall brackets fig 1 as shown below and push down at the center of the top of the frame fig 2 to secure For Technical Support or an EPV Screens conta...

Отзывы: