background image

V120617-ESC100 

www.epvscreens.com

 

Center Support Bar 

Step 11:

 Insert the 

Center Support 

Bar (i)

 into the upper top groove on 

the back of the frame with the bottom 
end near the approximate center point 
of the frame and rotate it in at an angle 
so that both ends of the bar are in 
alignment with the groove. 

Attention: Do not proceed with the Edge Trim installation until making sure there are no ripples in the material. 

Pre-check prior to Edge Trim Installation 

Correctly distinguish the top 
and bottom of the DarkStar® 
UST material. Place the 
assembled screen on the ground.  
Look down on the screen. If the 
material looks white/gray as 
shown below then it is correct.  

 

 

If the material looks black as 
shown below, then it is upside 
down. 

 

 

 

Edge Trim Installation 

Step 12

: Place the 

Edge Trim

 over each end of the frame and secure with 

M4x6 screws (c)

Start with the center points first, then the rest of the corners as shown below. 

 

 

 

 

 

Содержание DarkStar UST eFinity Series

Страница 1: ...e screen surface has a horizontal lens structure DO NOT wipe the screen up and down or in a circular motion Wipe very gently from left to right only 2 Please clean the dust on the screen surface with...

Страница 2: ...Edge Trim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a b...

Страница 3: ...are pre inserted into the grooves of the frame Please make sure to avoid the springs from slipping out of the grooves when you remove the foam Item Parts List EF100HUST DS EF120HUST DS a Center Joint...

Страница 4: ...t right angles Step 6 Secure the elbow joints by fastening them with M4x6 screws c 4 at each corner Screen Material Please read this important note before proceeding with the installation process of t...

Страница 5: ...ods are used on the vertical edges of the screen material and the shorter rods are used on the horizontal edges as shown below Step 9 Carefully and gently place the assembled frame on top of the scree...

Страница 6: ...en material are properly wrapped around the corner edges of the frame and material is evenly tensioned and flat creating a nicely taut surface Incorrect material installation The corners of the screen...

Страница 7: ...tion until making sure there are no ripples in the material Pre check prior to Edge Trim Installation Correctly distinguish the top and bottom of the DarkStar UST material Place the assembled screen o...

Страница 8: ...o hold the LED light strip in place Wall Installation Step 14 Measure the overall length and height of the frame and drill holes for the top brackets Line up the wall brackets with the drilled holes o...

Страница 9: ...elow and push down at the center of the top of the frame to secure Step 16 With the frame slightly tilted outward connect the bottom brackets onto the bottom groove of the frame Then secure them by sc...

Отзывы: