
REV.-A
●
Cover open
The printer lid is opened.
●
Fatal errors
In the following cases, the printer recognizes them as fatal errors and enters the fatal error mode. The
fatal error condition cannot be recovered until turning the power off.
●
Carriage does not move correctly
●
Control circuit cannot work correctly
When the error condition is detected, the printer automatically enters ‘PAUSE’ mode and outputs
appropriate interface signal.
When parallel interface is selected, the following interface signals are outputted to indicate the error
and to stop data transmission.
●
BUSY signal becomes HIGH
●
ERROR signal becomes LOW
●
Output no ACKNLG pulse
●
PE signal becomes HIGH (only paper out error)
1.6.5 Buzzer Operation
The buzzer sounds under the following conditions:
●
A paper-out error is detected (beeps 3 times for 0.1 second respectively, with 0.1 second intervals).
●
Ink end error is detected (beeps 5 times for 0.1 second respectively, with 0.1 second intervals).
●
Cover open error is detected (beeps 5 times for 0.1 second respectively, with 0.1 second intervals).
●
Fatal error is detected (beeps 5 times for 0.5 second respectively, with 0.5 second intervals).
●
When panel setting is accepted (beeps 1 time for 0.1 second).
1.6.6 Printer Initialization
There are three initialization methods: hardware initialization, software initialization, and panel
initialization.
(1) Hardware initialization
This type of initialization takes place when the printer power button is turned on with the AC power
cord plugged in or when the INIT signal is received.
When the printer is initialized, it performs the following actions:
(a) Initialize printer mechanism.
(b) Clears input data buffer.
(c) Clears downloaded character set.
(d) Clears print buffer.
(e) Returns printer settings to their default values.
1-21
Содержание SQ-1170
Страница 1: ...EPSON TERMINAL PRINTER SQ 870 1170 4001225 REV A ...
Страница 5: ... REVISION SHEET REVISON DATE ISSUED CHANGE DOCUMENT A Feb 21 1992 1st issue L e v ...
Страница 143: ...REV A T hlta RR Ransir nf the Main Board Cont w w 5 16 ...
Страница 149: ...c ...
Страница 153: ...REV A Figure 6 2 Lubrication Points 1 6 3 ...
Страница 154: ...REV A L Figure 6 3 Lubrication Points 2 6 4 ...
Страница 162: ...53 co Re tifier Figure A 4 C076 PSB Board Circuit A 9 ...
Страница 163: ...4 4 4 IJ 1 I 4 b 4 b 4 s v 5 s w 0 v Figure A 5 C076 PSB Board Circuit A 10 ...
Страница 164: ...1 L 1 I I I 1 z 44 7 r J 1 u u u L Ill R e c t i f i e r I Figure A 6 C076 PSE Board Circuit A 1 1 F i l t e r Diagram ...
Страница 165: ...1 1 1 1 N a I I r c1 L k Figure A 7 C076 PSE Boerd Circuit Diagram A 1 2 J ...
Страница 166: ... 11 I 1 I L I 1 Figure A 8 Control Panel Board Circuit Diagram A 1 3 ...
Страница 168: ...REV A C301 J n CIW Rl C7 am E c1 clo3 u d a R70 n Figure A 10 C076 MAIN Board Component Layout Back Side A 1 5 ...
Страница 173: ...REV A A 5 CASE OUTLINE DRAWING II h I 1 r H I I w I J 325 mm I r T 3 Figure A 19 SQ 870 Case Outline Drawing A 26 ...
Страница 174: ...REV A 1 I 1 I 1 1 I I I 1 yK 1 1 I 1 1 1 1 J 325 mm Figure A 20 SQ 1 170 Case Outline Drawing A 27 ...
Страница 176: ...EPSON Printed in Japan 92 02 7 G ...