EPS EF100H-CLR Скачать руководство пользователя страница 6

 

Rev. 04/27/17 DR 

www.epvscreens.com

 

 

After all four corners have been attached, proceed to attach the vertical sides of the material. Begin in the center 
and move towards the corners from (3) to (4) to (5).  Lastly, attach the horizontal sides of the material by 
starting with the center of the material and make your way towards the corners from (6) to (7) to (8). 

 
Note: 

Please make note of the yellow label and spring in the center of the frame.  This is an indicator to start the 

screen material installation process from the middle area of the frame. 
 
 
 
 
 
 

 
 
 

 
 
 
 
 

 
 
 
 
 

Note (after all springs have been attached): 
Correct material installation

 – Corners of the screen material are properly wrapped around the corner edges of 

the frame and material is evenly tensioned and flat, creating a nicely taut surface. 

 
 
 
 
 
 
 
 
 
Incorrect material installation

 –The corners of the screen material are not properly wrapped along the edge of 

the frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from 
material at the corner(s) where material does not lie flat along the edge of the frame, reposition the material so 
that it lies flat and wraps along the edge of the frame as much as possible, and reattach springs to the material. 

 
 
 
 
 
 
 
 
 
 
 
 

To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around 

the edges as illustrated in the check mark diagrams. 

 

Yellow label 

Yellow spring 

Содержание EF100H-CLR

Страница 1: ...has a horizontal lens structure DO NOT wipe the screen up and down or in a circular motion Wipe from left to right only 2 Please clean the dust on the screen surface with a soft brush or microfiber cloth rough towel or cloth may damage the screen s surface 3 Gently wipe the screen with a moistened microfiber cloth with mild soap diluted in water Notes The following precautions should be followed a...

Страница 2: ... Edge Trim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a b c d e f g h i j k l m n E E F F D D A A B B C C ...

Страница 3: ...me Step 3 Insert the center joint a connectors into one half of the horizontal frame b c and secure with the M4x6 screws c Item Parts List Qty EF90H CLR EF100H CLR EF120H CLR a Center Joints 1 4 4 4 b Elbow Joints 2 8 8 8 c M4x6 Screws 66 66 66 d Spring Hook 2 2 2 e Spring 84 92 104 f Top wall brackets 2 2 2 g Φ5x50 Wall Screws 6 6 6 h Hollow Wall anchors 6 6 6 i Bottom wall brackets 2 2 2 j Angle...

Страница 4: ...pre installed into the grooves of the frame Step 5 Connect the elbow joints b to the top and bottom sections of the vertical frame Once inserted connect the vertical sections to the horizontal frame sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Step 6 Secure the elbow joints by fastening them with M4x6 screws c 4 at each ...

Страница 5: ...l Slowly unroll the screen in a clockwise direction Step 8 Put on the white gloves m and carefully unroll the screen material on a clean surface from the roller to the other side as shown below The back side black of the screen material should be placed upwards Step 9 Carefully and gently place the assembled frame on top of the screen material Make sure to not allow the angle edge of the frame to ...

Страница 6: ...f the screen material are properly wrapped around the corner edges of the frame and material is evenly tensioned and flat creating a nicely taut surface Incorrect material installation The corners of the screen material are not properly wrapped along the edge of the frame leaving the material with unbalanced tension and an uneven finish To correct detach springs from material at the corner s where...

Страница 7: ...n angle so that both ends of the bar are in alignment with the groove Diagonal Models 150 and below use 1 x Center Support Bar Pre check prior to Edge Trim Installation Correctly distinguish the top and bottom of the DarkStar UST material Place the assembled screen on the ground Look down on the screen If the material looks white gray as shown below then it is correct If the material looks black a...

Страница 8: ...does not get installed on the bottom Then insert the LED light clip l to hold the LED light strip in place Notice to Installer Please use the following installation instructions to obtain superior optical performance from EPV s innovative DarkStar UST screen material The DarkStar UST is exclusively for table mounted ultra short throw projectors as illustrated in the Example 1 diagram Overhead plac...

Страница 9: ...e ALR Ambient Light Rejecting Screen Example 1 Proper Projector Installation Example 2 Improper Projector Type Installation Note Improper installation will result in light loss and produce a dark image This is due to the projector s light reflecting in the wrong direction Images are not up to scale and are for illustration purposes only www Elitescree ...

Страница 10: ...wood stud use a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 15 Position the fixed frame screen onto the top wall brackets as shown below and push down at the center of the top of the frame to secure Step 16 With the frame slightly tilted outward connect the bottom brackets onto the bottom groove of the frame Then secure them by ...

Отзывы: