![EPS EF100H-CLR Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/eps/ef100h-clr/ef100h-clr_user-manual_2418440006.webp)
Rev. 04/27/17 DR
www.epvscreens.com
6
After all four corners have been attached, proceed to attach the vertical sides of the material. Begin in the center
and move towards the corners from (3) to (4) to (5). Lastly, attach the horizontal sides of the material by
starting with the center of the material and make your way towards the corners from (6) to (7) to (8).
Note:
Please make note of the yellow label and spring in the center of the frame. This is an indicator to start the
screen material installation process from the middle area of the frame.
Note (after all springs have been attached):
Correct material installation
– Corners of the screen material are properly wrapped around the corner edges of
the frame and material is evenly tensioned and flat, creating a nicely taut surface.
Incorrect material installation
–The corners of the screen material are not properly wrapped along the edge of
the frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from
material at the corner(s) where material does not lie flat along the edge of the frame, reposition the material so
that it lies flat and wraps along the edge of the frame as much as possible, and reattach springs to the material.
To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around
the edges as illustrated in the check mark diagrams.
4
5
4
5
7
7
8
8
6
6
3
3
2
1
2
1
Yellow label
Yellow spring