![Epoch Design Seneca Twin over Full Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/epoch-design/seneca-twin-over-full/seneca-twin-over-full_quick-start-manual_2418096002.webp)
16x
100 mm bolts
Used to connect headboards
and footboard to side rails
18x
Barrel nuts
Used to secure bolts
2x
Upper end boards
Used on upper bunk
1x
Ladder
Attaches to upper side rail
for entry to upper bunk
1x
Twin slat bundle
Rest evenly strap side down
on upper bunk side rails
1x
Full slat bundle
Rest evenly strap side down
on lower bunk side rails
2x
Long safety rails
Used for attachment to upright
supports on wall side of bunk
1x
Center support
Used on lower bunk
2x
Upper side rails
Used to connect upper end boards
2x
Lower side rails
Used to connect lower end boards
2x
Lower end boards
Used on lower bunk
1x
Short safety rail
Used on the ladder
side of the upper bunk
2x
Upright spports
Used to attach long safety rails
to upper side rails
2x
15 mm round head screws
Used to attach ladder
hooks to side rails
75x
30 mm Slat screws
Used to secure slats to
side rails and center supports
1x
Hex key
Used to tighten
hardware
4x
Bunk connector pins
Used to connect upper
bunk to lower bunk
16x
45 mm bolts
Used to assemble long
safety rails and connect
safety rails to side rails
2x
80 mm bolts
Used to secure center support
Have a question? Need a part ASAP? Call 1-800-589-7990 or email [email protected].
Pre-drilled holes
13-Aug-2018
2/4
mm
10
20
30
40
50
60
70
80
90
100
110