Epoch Design Radia 5119 Скачать руководство пользователя страница 5

Next use a Phillips head screwdriver to sink two 30 mm wood 

screws through the bracket and into the bottom of the tray 

R

.

Have a question?  Need a part ASAP?  Please call 1-800-589-7990 (Monday through Friday 9am to 5pm PST).

Hang the alarm clock 

tray

 S 

anywhere along 

the top side rails.

Hang the printer/CPU 

tray 

anywhere along 

the bottom rails. 

**NOTE: 

To reposition trays remove    

         trays completely and       

                  gently reposition to avoid 

scratching finish.

Attach the three wire organizer baskets 

T

U

V

, to the pegboard as desired by 

tilting the basket and inserting the prongs into the holes and push the basket back 

down to a level position to secure the basket to the pegboard (See diagram 

XIX

).

Install the 

L

 bracket in the predrilled holes underneath the desk 

and behind the ladder/safety rail assembly using two 15 mm 

wood screws and a Phillips head screwdriver (See diagram 

XVII

).

XVIII

XVII

XIX

Locate the corkboard 

P

 and pegboard 

Q

.  

Make sure the spring loaded pins are at 

the top of each backboard. Push the pins 

flush to the backboard and insert the 

backboard into the grooved rails on the 

loft (See diagram 

XVIII

).

17

14

Attach the two printer/CPU 

brackets to the tray 

R

 using two 

40 mm bolts that go through the 

back of the tray. Tighten with the 

hex key provided.

2-Aug-2018

5/5

Отзывы: