Ensure material slide gate is closed and open
burner access door
Set Thermostat to
OFF
Add 3 - 4 Bags of material to kettle if needed
Fully Open LP tank valve
Open main system propane valve
Check hydraulic bypass valves:
Left Valve
(A)
Open
Right Valve
(B)
Closed
Place agitation direction lever in the neutral
(middle) position
Start engine
Ignite Pilot:
1)
Press and hold
RED
pilot button and
BLACK
igniter button at the same time
2)
Release
BLACK
igniter button upon
successful pilot light
3)
Continue to press
RED
pilot button until
pilot flame is achieved
4)
If flame goes out or unsuccessfully lights,
wait 30 - 60 seconds and try againt
Adjust oxygen relay disc if needed, otherwise
close burner access door
Set thermostat to 300ºF
Set desired agitation speed by adjusting the
Cycle Speed control dial.
Wait for material to reach 250ºF - 300ºF
Set thermostat to desired temperature of
380ºF - 400ºF
Add additional material if needed
Install material extrusion chute, then check
material consistency
Move applicator (handliner) into position
Toggle agitation direction lever to begin agita-
tion (either up or down).
Note:
If material is too thick, wait before
enabling agitation.
Set thermostat to
OFF
and make sure the
flame goes out
Drain material in the kettle into draw-off pans
until either 25% full or completely empty.
If leaving material for next day, adjust the
Speed Cycle dial to a “slow” setting until
temperature reaches 150º F
Set agitation direction lever to the neutral
(middle) position
Turn engine key to
OFF
position
Close main system propane valve and close
100lb LPG tank valve
Make sure the material feed hopper door is
closed
QUICK START CHECKLIST
PRE START
SHUTDOWN
SYSTEM STARTUP
2811 Fiechtner Drive
Fargo, ND 58103
701-367-9233 Phone
701-277-7073 Fax
epicsolutions.us