Ensure material slide gate is closed and open 
burner access door

Set Thermostat to 

OFF

Add 3 - 4 Bags of material to kettle if needed

Fully Open LP tank valve

Open main system propane valve

Check hydraulic bypass valves:
Left Valve 

(A)

 Open

Right Valve 

(B)

 Closed

Place agitation direction lever in the neutral 
(middle) position

Start engine

Ignite Pilot:

1)

Press and hold 

RED

 pilot button and 

BLACK

igniter button at the same time

2)

Release 

BLACK

 igniter button upon

successful pilot light

3)

Continue to press 

RED

 pilot button until

pilot flame is achieved

4)

If flame goes out or unsuccessfully lights,

wait 30 - 60 seconds and try againt

Adjust oxygen relay disc if needed, otherwise 
close burner access door

Set thermostat to 300ºF

Set desired agitation speed by adjusting the 
Cycle Speed control dial.

Wait for material to reach 250ºF - 300ºF

Set thermostat to desired temperature of 

380ºF - 400ºF

Add additional material if needed

Install material extrusion chute, then  check 
material consistency

Move applicator (handliner) into position

Toggle agitation direction lever to begin agita-
tion (either up or down).

Note:

 If material is too thick, wait before 

enabling agitation.

Set thermostat to 

OFF

 and make sure the 

flame goes out

Drain material in the kettle into draw-off pans 
until either 25% full or completely empty.

If leaving material for next day, adjust the 

Speed Cycle dial to a “slow” setting until 
temperature reaches 150º F

Set agitation direction lever to the neutral 
(middle) position

Turn engine key to 

OFF

 position

Close main system propane valve and close 
100lb LPG tank valve

Make sure the material feed hopper door is 
closed

QUICK START CHECKLIST

PRE START

SHUTDOWN

SYSTEM STARTUP