28
5. COBRA-30177 Regulator disassembly and assembly flow
The Rk-J kit contains all parts required
for perodic service. In installation of
complete kit should be required only at
time of a major overhual of the
converter, or the converter has been out
of service for 30 days. Gasket and
diaphragms may deteriorate if the
converter has been stored after
use. Inspect the gaskets before re-
installing the converter
1
2
Remove the 6 screws from secondary
cover assembly, Note the type of screws
removed and sure the same type and
size of screws are used in the same
locations during reassembly
3
Loosen the secondary cover by tapping
around the circumference with a plastic
screwdriver handle
Содержание CPQD15N-RW21-Y
Страница 19: ...18 3 Remove the cover and the gasket 4 4 Remove the filter and screen 5 Remove screw holding spring in p ...
Страница 20: ...19 6 Remove the valve spring 7 Remove valve seat 8 Remove valve operating pin ...
Страница 28: ...27 30 Add cover and secure with screws ...
Страница 40: ...39 BRC dual fuel system BRC single fuel system No serial number 27 28 29 30 ...