![EP Equipment PB2000 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/ep-equipment/pb2000/pb2000_user-manual_2417089010.webp)
( 9 )
GB-6210 Manual
ON!
4. Operation Procedure
4-1-1 Turn on the machine
4-1-2 Warming Up
- Plug the power cord to outlet.
- Turn on the main switch.
- The Heat Preparation Lamp turns on, the
machine is heating the glue in the melt tank.
You can not operate the machine now.
- Warming up time is about 20 minute.
- Start lamp turns on when the machine is ready
to operate, but it keeps heating; please wait 5
more minutes so that the glue in the melt tank
can fully melted.
ON!
ON!
4-1 Preadjustments for operation
Make adjustments to ensure good binding quality when turn on the machine.
ON!
4-1-3 Set the nipping time
- Depress Nipping Time Control Button, you
can adjust the nipping time (between nipping
table raise and nipper plate open).
- For books with 100 sheets, nipping time
should be 5 seconds; for books with 200 sheets
or more, the nipping time should be 8 seconds
or more. For padding, the nipping time should
be 0 second.
4-1-4 Set the clamper width
- Depress clamper open/close button to adjust
the clamper width.
- After each binds, clamper width remains the
same.