46
Installation and Operating Instructions - EOS Herkules XL S120
Connections
EN
2
Connect the water supply.
Use pipe insulation tape to ensure it is sealed.
3
Verify that the float valve is aligned vertically.
Align it vertically by hand if needed.
The water supply should be opened only after the heater has been placed
in its final location. These steps are described in the chapter 4.8 Positioning
the heater,
46.
4.8 Positioning the heater
The heater is placed in position after the electrical connection (and the
water supply for EOS Herkules XL S120 Vapor) have been established.
Necessary steps:
EOS Herkules XL S120 Vapor: checking the water installation for leaks,
EOS Herkules XL S120 Vapor: setting the water level,
Tools:
Screwdriver
Positioning the heater
1
CAUTION! The heater weighs a minimum of 85 kg. Four people should
always move the heater.
Lift the heater and place it in the pre-designated location. Ensure that
the connecting lines are not pinched.
2
Attach the side panels.