3
If the sauna cabin is not equipped with
cable conduits for the connecting lines,
these lines must be laid directly onto the
cabin wall, where they will be visible. For
this purpose, the three mounting holes
must be pre-drilled, as shown in Illust. 3.
Because the connecting lines must be laid
between the capacitor and the cabin wall
in this type of installation, for practical
purposes in a recess of the grooved
panels, the power control unit must be
installed in such a way as to provide for
adequate clearance. For this purpose, 3
spacer tubes are provided with the unit.
Using these tubes, the lower part is
installed to provide for this clearance as
shown in Illust. 3.2. After the connecting
lines are fed through the respective feed-
through channels into the unit, bolt the
lower part, again with help of the spacers,
into the lower mounting holes on the cabin
wall.
The electrical installation may be
accomplished only by a certified electrician
subject to the regulations of the local po-
wer utility company and those of the VDE.
Illust. 3
Mounting hole
Mounting holes
Illust. 4
Feed-through
channel for power
supply lines
Feed-through
channel for oven
supply line
Illust. 3.2
Illust. 3.1