12900 Christopher Drive Lowell, MI 49331
800.815.7251
www.enwork.com
Specifications subject to change without notice.
Страница 1: ...Zori Media Cart Assembly Instructions Zori Media Cart Installation Guide rev A ...
Страница 2: ...1 Parts and Fasteners Included INSTALLATION GUIDE 10 x 1 1 4 Button Head Screw 1 4 20 x 2in Flat Head Screw ...
Страница 3: ...2 Tools and Supplies Required INSTALLATION GUIDE Phillips Head Screw Driver ...
Страница 4: ...3 Assembly Overview INSTALLATION GUIDE Fig 1 Frame Assembly Fig 2 Credenza Assembly Fig 3 Base Frame Assembly Fig 4 Power Unit specific unit may vary ...
Страница 5: ...ed evenly from all sides Attach the base frame to the bottom panel using the included 16 10 x 1 1 4 Button Head Screws Rotate the Credenza Assembly Base Frame Assembly to an upright position and lock the casters Fig 5 Using a philips head screw driver remove the 5 screws and top cap from the Frame Assembly Fig 1 Carefully remove the whiteboard panels and set aside Media Table Assembly ...
Страница 6: ...e Credenza Fig 4 Start to thread the 8 1 4 20 x 2in Flat Head Screw but do not tighten until all the screws are loosely placed Tighten the 8 1 4 20 x 2in Flat Head Screws Carefully replace the whiteboard panels Replace the frame assembly top cap and replace and tighten the philips head screws Insert Power unit Fig 4 The assembly is now ready for the monitor mount Media Table Assembly ...
Страница 7: ...12900 Christopher Drive Lowell MI 49331 800 815 7251 www enwork com Specifications subject to change without notice ...