
I N S T A L L A T I O N G U I D E
3 ) A S S E M B L Y : W O R K S U R F A C E I N S T A L L A T I O N
Before installing the Work Surface, verify that
the table Base is level and that the Support
Beams are parallel. Refer to the Equilibrium
Installation Guide for leveling instructions.
Verify how many Tight-Joints are on the Work
Surface. Standard Work Surfaces 36”- 48”D
have (4) tight joints per seam, and 54” -72”D
tops have (6) tight joints per seam.
Place the Work Surface on the Base,
Tight-Joint channels down.
Loosely install all the Tight-Joints. The
Work Surface may be moved to access
all the Tight-Joint Locations. Do not
completely tighten the Tight-Joints yet.
F I G U R E 1
F I G U R E 2
F I G U R E 3