background image

HOLD WORK SURFACE SECURELY IN THE 

DIRECTION OF THE ARROW.

WHILE HOLDING PRESSURE IN THE DIRECTION OF BOTH 
ARROWS, INSTALL QTY: 4, PROVIDED WOOD SCREWS 
TO ATTACH “L” BRACKET TO WORK SURFACE. 
NOTE THAT HOLES ARE PRE DRILLED IN WORK SURFACE 

 

NOTE THAT THE BACK OF 

THE “L” BRACKET IS TO BE 

TIGHT TO THE BACK OF 

THE WORK SURFACE

STEP 4 

SECURING WORK SURFACE 

Содержание Concurrence VS

Страница 1: ...Concurrence VS Table Installation Instructions Rev 0315 ...

Страница 2: ...1 ...

Страница 3: ...NSIDE THIS TAB AND RESTS ON THE TOP OF COLUMN BEAM MUST REST ON TOP OF COLUMN FOR PROPER FIT USE PHILLIPS HEAD SCREWDRIVER TO INSTALL 2 20 X SCREWS PER COLUMN DO NOT TIGHTEN YET STEP 1 ATTACHING HORIZONTAL BEAMS TO MONITOR WALL ...

Страница 4: ...N BEAM MUST REST ON TOP OF COLUMN FOR PROPER FIT USE PHILLIPS HEAD SCREWDRIVER TO INSTALL 2 20 X SCREWS PER COLUMN TIGHTEN ALL SCREWS USE PHILLIPS HEAD SCREWDRIVER TO INSTALL AND TIGHTEN QTY 2 20 X FLAT HEAD SCREWS 2 PLACES STEP 2 ATTACHING HORIZONTAL BEAMS TO PANEL BASE ...

Страница 5: ...4 REPEAT PREVIOUS STEPS SO THAT BOTH BEAMS ARE INSTALLED AND TIGHTENED SECURELY NOTE THAT WORK SURFACE NOTCH SLIDES INSIDE WALL EDGES STEP 3 INSTALLING WORKSURFACE ...

Страница 6: ...G PRESSURE IN THE DIRECTION OF BOTH ARROWS INSTALL QTY 4 PROVIDED WOOD SCREWS TO ATTACH L BRACKET TO WORK SURFACE NOTE THAT HOLES ARE PRE DRILLED IN WORK SURFACE NOTE THAT THE BACK OF THE L BRACKET IS TO BE TIGHT TO THE BACK OF THE WORK SURFACE STEP 4 SECURING WORK SURFACE ...

Страница 7: ...6 ATTACH 90 DEGREE NW BRACE TO WORK SURFACE WITH PROVIDED WOOD SCREWS 6 SCREWS PER BRACE 90 DEGREE NW BRACE INSTALL QTY 4 WOOD SCREWS PROVIDED PER LZYPLATE LZYPLATE STEP 4 CONT SECURING WORK SURFACE ...

Страница 8: ...7 ROUTE MONITOR WIRING BEFORE INSTALLING MONITORS SEE INCLUDED MANUFACTURES MONITOR MOUNTING BRACKET ASSEMBLY INSTRUCTION STEP 5 ROUTING MONITOR WIRING ...

Страница 9: ...TAPE INSTALL PROVIDED CABLE GRIPPERS TO BOTTOM OF WORK SURFACE WITH PROVIDED WOOD SCREWS SAMPLE WIRING DIAGRAM ACTUAL COMPONENT PLACEMENT VARIES DEPENDING ON TABLE SIZE AND LOCATION OF POWER SOURCE PROVIDED POWER DATA UNIT UNIT WILL VARY DEPENDING ON ACTUAL ORDER EXTRON AV UNIT PLEASE SEE AV EQUIPMENT MANUFACTURES INSTRUCTION INCLUDED FOR DETAILED INSTALLATION STEPS STEP 6 AV INSTALLATION ...

Страница 10: ...E THAT POWER CORD DROPS BETWEEN WALL AND RUNS THRU BOTTOM COMPONENTS POWER CAN BE RUN THRU PANEL BASE AS WELL ROUTE TV POWER VIDEO CORDS THRU THE ROUND CUTOUTS IN WALL BACK PANEL STEP 6 CONT AV INSTALLATION ...

Отзывы: