12
Call 1300 369 273
www.enware.com.au
Every 6 months or periodically as required, the appliance and its surrounding area should be
inspected for water leaks, the bottle filler and bubbler should be tested for correct operation
and external panels should be given a light wipedown.
Filters if used should be replaced, depending on usage. Water storage tank should be purged
by running the tap for 5 minutes, before installing a new filter.
Every 12 months or as required, the bubbler stream height should be re-adjusted. If the
bubbler or bottle filler is leaking, the cartridge or bottle filler SBA should be replaced or
serviced.
The internal condenser and fans should be kept free of dust/ lint. It should be checked
periodically and cleaned with a brush or vacuum cleaner. Water cooler must be disconnected
from the power supply before following this procedure.
service & maintenance