PIV & MIV
®
Loft Mounted Unit
PRE-INSTALLATION CHECKLIST
Check that the loft has adequate cross
flow ventilation.
Check that all party walls are intact, seek
advice if the wall is missing or broken.
Check that any flue which passes through
the loft is not damaged, seek advice if the
flue is in a poor state of repair.
Check for any flued appliance which may
draw air from the loft, report to the client.
Check for any holes in the ceilings which
may allow leakage of air to the loft and
repair as appropriate.
Check that the water storage tank is
covered.
FIXING KIT
Description
Item
8 X FOAM PADS
4 X PENNY
WASHERS
4 X PLASTER
BOARD PLUGS
4 X WOOD
SCREWS (10 X 1.5)
4 X WOOD
SCREWS (10 X 3)
4 X WOOD
SCREWS (8 X 1)
4 X WOOD
SCREWS (8 X 1.5)
ROLL OF
INSULATION TAPE
02