Enviro Q3L Скачать руководство пользователя страница 39

Notes

Page 39

Содержание Q3L

Страница 1: ...ing property damage personal injury or loss of life Installation and service must be performed by a qualified installer service agency or the gas supplier Version Française www enviro com fr html 4001609 W A R R A N T Y R E G I S T R A T I O N e n v i r o c o m w a r r a n t y Q3L D I R E C T V E N T F I R E P L A C E N O VA ...

Страница 2: ...our gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Massachusetts installations Warning This product must be installed by a licensed plumber or gas fitter when installed within the Commonwealth of Massachus...

Страница 3: ...e must be performed by a qualified installer service agency or gas supplier This installation must conform to local codes or in the absence of local codes with the National Fuel Gas Code ANSI Z223 1 NFPA 54 or the Natural Gas and Propane Installation Code CSA B149 1 To prevent injury do not allow anyone who is unfamiliar with the stove to operate it To prevent injury if the pilot or pilot and burn...

Страница 4: ...Burner Removal 12 Access Door 13 Gas Conversion Kit Installation 13 Initial Installation 16 Introduction 16 Exhaust Height Set Up 16 Placement and Framing 17 Corner Installation 18 Framing Plate Installation 19 Mantle and Non Combustible Clearances 20 Direct Vent 21 Vent Termination Restrictions 22 Venting Clearances 23 Approved Venting Parts 23 Horizontal Termination No Rise 25 Allowable Co Axial...

Страница 5: ...2 33 2014 VENTED GAS FIREPLACE HEATERS CAN CGA 2 17 M91 R2009 GAS FIRED APPLIANCES FOR HIGH ALTITUDES This ENVIRO Q3L Fireplace Has been certified for use with either natural gas or propane see rating label Is not for use with solid fuels Is approved for a bedroom or bed sitting room IN CANADA must be installed with a listed wall thermostat IN USA see current ANSI Z223 1 for installation instructi...

Страница 6: ... removed All important information for your fireplace is on this label as well of the model specific serial number which you will need for warranty information Gas Line Figure 2 Q3 Dimensions Page 6 34 7 16 874mm 26 660mm 24 1 4 616mm 29 13 16 757mm 33 3 4 858mm 16 3 4 426mm 5 15 16 151mm 11 4 33mm 18 5 8 473mm 16 1 8 410mm 31 1 4 794mm X 25 15 16 658mm 29 15 16 760mm For dimension variable X plea...

Страница 7: ...t to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department C Use only your hand to...

Страница 8: ...e is getting too much air Therefore the air shutter should be closed pushed it slightly until the correct flames are achieved Flames that are very orange with tall dark stringy tips are not getting enough air Open the venturi until the flames clean up If the venturi is opened or closed all the way and the correct flames cannot be attained turn off the gas and contact the dealer WARNING Incorrect v...

Страница 9: ...Turn gas control knob COUNTER CLOCKWISE to ON C Flip the burner switch to ON D Turn HI LO knob to the desired flame height Blower speed The blower will come on only when the fireplace is up to temperature approximately 15 minutes The speed of the fan can be changed by turning the fan control knob The blower will continue to operate automatically after the unit has been shut off approximately 25 mi...

Страница 10: ...ount of use the glass should require cleaning no more than two or three times a season Do not clean the glass when it is hot Cleaning The Firebox Remove the logs carefully as they are very fragile Gently remove all the coals and place on a paper towel Vacuum the bottom of the firebox thoroughly Carefully clean any dust off the logs and remove any lint from the burner and pilot At this time inspect...

Страница 11: ...on a soft cloth BEFORE lighting the fireplace Never clean the face when it is hot Do not use other cleaners as they may leave a residue which can become permanently etched into the surface Safety Screen Figure 7 Safety Screen Mounting Brackets Page 11 Figure 8 Safety Screen Removal A safety screen is installed from the manufacture to protect its users from the dangers of the hot glass preceding it...

Страница 12: ...ter Insure the front and rear lengths of the burner tube are parallel as it may have distorted with heat over time The ideal placement for the burner tube is keeping it forward up against the burner stand stops Page 12 Glass Door Removal Figure 9 Upper Door Latch The door needs to be removed for sceduled cleaning and other options To remove the glass door use your two index fingers to pull the spr...

Страница 13: ...ster Carefully inspect all parts supplied with this conversion kit If any parts have been damaged or are missing contact your dealer distributor or courier company to have them replaced before starting this installation Maintenance And Service Page 13 DATE 8 6 2014 BY SHERWOOD INDUSTRIES LTD INTERNAL ASSEMBLY MANUAL THIS DRAWING IS THE PROPERTY OF SHERWOOD INDUSTRIES LTD AND MAY NOT BE COPIED REPR...

Страница 14: ...The gas supply must be shut off prior to disconnecting the electrical power and before proceeding with the conversion Allow the valve and unit to cool down to room temperature 2 Remove the glass door as shown in the Maintenance and Service Glass Door Removal 3 Carefully remove the ceramic log set 4 Remove the burner as shown in the Maintenance and Service Burner Removal 5 Convert the burner orific...

Страница 15: ... 14 Relight the main burner in both the HI and LO positions to verify proper burner ignition operation and proper flame appearance Confirm the inlet and manifold pressures are within the acceptable ranges as directed in section Intial Intallation Gas Line Connection and Testing If the Q3 has been installed at an altitude higher than 2000ft 610m it is required to de rate the unit accordingly In the...

Страница 16: ...atch the exhaust plate and this is determinded by the hole position Each plate has and A and B configuration that can be interchanged by simply rotating the plate as seen in Figure 13 Figure 13 The plate images shown above are for a visual representation of the configuration swap This Figure applies to both the Intake and Exhaust plate sets Distance from Floor to Center in Plate Number and Configu...

Страница 17: ...ld be made of wood or a non combustible material The gas line 3 8 JIC fitting should be brought to the right side of the fireplace The location should be chosen so the fireplace will be at least 36 inches 91 4 cm from drapes doors and other combustibles The framed opening should also be a minimum of 9 22 9 cm from the nearest perpendicular wall sidewall to the edge of the opening Page 17 Figure 16...

Страница 18: ...wable Co axial Vent Configurations for allowable pipe lengths Do not interfere with the structural integrity of the walls Shown below are minimum clearences increasing these dimensions is allowable as long as vent length remains in the allowable range Figure 17 Dimensions for a Corner Installation Page 18 15 7 16 392mm 14 7 16 366mm 63 1 8 1603mm 44 11 16 1135mm 8 5 16 211mm 31 9 16 802mm ...

Страница 19: ...ble material is only necessary over the fireplace opening and does not need to span the entire width of the framing plate A wood mantle can we placed over top of the non combustible as long as it stays within the mantle specicifactions Remove these two existing machine screws from the top of the cabinet Place the metal framing plate on top of the unit and replace these screws in the same hole they...

Страница 20: ... of the framing plate In Front of Unit The Q3 can be placed on the floor if desired although it is recommended that it be raised aleast an inch or higher for more heat sensetive materials such as carpet or linoleum Adjacent Sidewall There must be a minimum distance of 9 229mm from the side of the Q3 cabinet to an adjacent wall composed of combustible material Mantle It is not necessary to install ...

Страница 21: ... or stainless steel flex venting The flue collar of this model will fit inside of a standard 4 x 6 5 8 vent and must be either correctly interlocked or fastened with three screws directly to the vent collar Check periodically that the vents are unrestricted Also ensure that all direct vent pipes have been properly sealed and installed after routine inspection or cleaning The air intake and exhaust...

Страница 22: ...r that may be opened C 12 in 30 cm Clearance from permanently closed window to prevent condensation D 24 in 60 cm Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 ft 60 cm from center line of terminal E 18 in 45 cm Clearance to unventilated soffit F 12 in 30 cm Clearance to outside corner G 12 in 30 cm Clearance to inside corner H 3 ft 91 cm with...

Страница 23: ... pipe the clearance to combustibles should be 2 51 mm above and 1 38 mm on the sides and bottom When combustible materials are directly above a 90 elbow 3 76 mm of clearance are necessary Table 5 Vent Pipe Minimum Clearances Vertical Pipe to the Side Walls Horizontal Pipe to the Sides Bottom Above an Elbow Above the Unit Above an Elbow Not Above the Unit Above Horizontal Vent Pipe Wall Frame 8 203...

Страница 24: ...902 4DT 48 SV4L48 4D4 48 pipe length 945 4DT EL45 SV4EBR45 4D45B 45 elbow black 990 4DT EL90 SV4EBR90 4D90B 90 elbow black 950 4DT VS SV4VS Vinyl siding standoff sheild 942 4DT WT SV4RSN 4DWT Wall thimble 953 4DT SC SV4FC 4DSC Storm collar 963 4DT FS SV4BF 4DFSP Fire stop 988 4DT WS B SV4BM 4DWS Wall strap support band 970 4DT HKA SV0SHK 4DHTK1 Horizontal termination kit SD Basic Kit SEL Kit A SC ...

Страница 25: ...ruction configurations If the Q3 is to be installed with no vertical vent rise then follow the parameters shown in Figures 22 and 23 Figure 23 Parallel Vent Termination 6 15 cm Min vent length 18 46 cm Max vent length Approved horizontal termination Approved through wall thimble Note For every 12 305mm of horizontal venting travel there should be at least 1 4 6 4mm of vertical travel Page 25 IF YO...

Страница 26: ...t system will perform better than a longer one The total length of horizontal vent pipe can not exceed 20 feet 6 1m and the total vent length can not exceed 40ft 12 2m Any combination of rise and run can be used as long as it lays within the shaded area a total of two 2 90 elbows or four 4 45 elbows can be used In addition to what is shown if a 90 elbow is used in the horizontal plane 3 feet 91 4c...

Страница 27: ...t portion of the standoff providing an air space between the wall and the vent termination The air gap prevents excessive heat from possibly melting the vinyl siding 6 Horizontal pipes must be supported every 3 914 mm Plumber s all round strap will suffice 7 When running horizontal pipe clearances to combustibles must be maintained 1 inches 38 mm sides 1 inches 38 mm bottom and 2 51 mm top Step 1 ...

Страница 28: ...end from the vent cap assembly to the outer wall of the vent pipe Bend any remaining portion of the strap back towards the vent cap Security Secure Vent uses a twist lock cap Step 5 Position the horizontal vent termination in the center of the 10 25 4 cm square hole and attach to the exterior wall with the four screws provided The arrow on the vent termination should be pointing up Run a bead of n...

Страница 29: ...ing to the roof with roofing nails Use a non hardening sealant between the uphill edge of the flashing and the roof Insure the roofing material overlaps the top edge of the flashing Verify that you have at least the minimum clearance to combustibles at the roof line Step 8 Continue to add pipe sections until the height of the vent cap meets the minimum code requirements Refer to Figure 27 and Tabl...

Страница 30: ...ing should be framed to 10 254 mm x 10 254 mm inside dimensions in the same manner as shown in Figure 21 plumber s tape connected to wall strap Wall strap 45 elbows x2 4 Any occupied areas above the first floor including closets and storage spaces which the vertical vent passes through must be enclosed The enclosure may be framed and sheet rocked with standard building materials However consult th...

Страница 31: ...hutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than psig 3 45 KPa Always check for gas leaks with a soap and water solution after completing the required pressure test TO TEST VALVE PRESSURES The pressure taps are located on the top right of the valve shown in Figure 30 Turn set screw 1 turn counter clockwise to loosen Place 5 16 8 mm I ...

Страница 32: ...n Verify proper operation after servicing Table 10 Recommended Thermostat Wire Size Wire Size Max Length 14 gauge 100 ft 30 48 m 16 gauge 60 ft 18 29 m 18 gauge 40 ft 12 00 m 20 gauge 25 ft 7 62 m 22 gauge 18 ft 5 49 m Figure 32 Accessory Wiring Figure 31 Q3 Wiring Diagram COOL HEAT PROGRAM DOWN UP 70 F 70 F O N O F F Optional Remote Control Blue Blue Optional Wall Switch Optional Thermostat Pilot...

Страница 33: ... of local codes with the current CSA C22 1 Canadian Electrical Code Part 1 Safety Standards For Electrical Installations or The National Electrical Code ANSI NFPA 70 in the US CAUTION When servicing controls label all wires prior to disconnection Wiring errors can cause improper and dangerous operation Verify proper operation after servicing If any of the original wire supplied with the appliance ...

Страница 34: ...s shown Bring the burner tube as far forward as you can on the burner stands Try to maintain parallelism between all the components in this step Step 2 Bust up the ember wool as fine as possible clump the wool together and separate it using the supplied brush over the front section of the burner tube It is best to have less ember wool keep it light and fluffy Do not put the ember wool on the back ...

Страница 35: ...Place the larger log into position by locating the lower notch on the grate arm The upper end of the log will rest on the tip of the finger shaped log below Roll the log forward until the it resembles Figure 37 Step 4 Install the final elbow shaped log into position There is a notch on the bottom of the log to locate it on the grate crossbar as well as a notch to locate the log onto the grate arm ...

Страница 36: ...te screw check pilot head for damage Check thermocouple voltage at valve It must be greater than 5 mV If low replace thermocouple Air in gas line pilot dies while knob is depressed Bleed line Check gas line pressure Contact dealer Burners will not remain lit Problem with thermopile circuit Check gas line pressure Check for flame impingement on thermopile If low see Pilot will not remain lit Check ...

Страница 37: ... Assembly Standing Pilot 50 2513 12 120 Degree Fan Temperature Sensor EC 001 13 Q3 Log Tube Burner 50 3103 14 High Definition Log Set 50 2979 15 Door Complete 50 3105 16 Q3 Safety Screen and Frame 50 3099 17 Ceramic Brick Liner Set 4 Pieces 50 3106 18 Burner Orifice NG 32 NG 50 LP 50 343 12 oz Can of Metallic Black Touch Up Paint PAINT 12 MB 12 oz Can of Flat Black Touch Up Paint PAINT 12 FB Q3 Co...

Страница 38: ...Page 38 Parts Diagram 1 2 3 4 5 6 7 11 9 10 8 12 13 14 15 16 17 18 ...

Страница 39: ...Notes Page 39 ...

Страница 40: ...Page 40 Notes ...

Страница 41: ...ncluding serial number This warranty does not cover any discoloration of the safety screen mesh Exclusions An expanded list of exclusions is available at www enviro com help warranty html This warranty does not cover Damage as a result of improper usage or abuse Damage caused from over firing due to incorrect setup or tampering Damage caused by incorrect installation To the Dealer Provide name add...

Страница 42: ..._________________________________ MODEL ___________________________________ SERIAL NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy NATURAL GAS NAT PROPANE LPG INLET GAS PRESSURE _________in wc MAIN BURNER ORIFICE __________ DMS PILOT ORIFICE _________OR________in diam INSTALLER S SIGNATURE ____________________________________...

Отзывы: