User’s Guide
–
–
E
E
n
n
v
v
i
i
r
r
o
o
-
-
S
S
e
e
p
p
t
t
i
i
c
c
S
S
y
y
s
s
t
t
e
e
m
m
July 30
th
, 2013
25
Appendix B - Information Specific to Your Treatment System
Information on
your Enviro-
Septic System
System number
13
____________ Installation date: ____________________
Designer /Engineer: ___________________________________________
Installer / Contractor: ___________________________________________
Municipal inspector: ____________________________________________
Treatment class :
II
–
Secondary
III
–
Secondary avanced
Number of rows of pipes: ___________________
Hydraulic capacity (L/d): ___________________
Number of 3,05 m pipes per row: _______________
Water Distribution
•
Distribution box
•
Pumping station
•
Wastewater distributing valve
•
Low pressure distribution system
Septic tank capacity: ______________________________
Notes
13
Number on the system tag in the lid of the sampling port and starting with DBO- (see Figure 1 on page 5).