Total Sulfur Option User Manual
–
Revision 1.0
7
3.1.1 Connecting Vacuum Fitting to Quartz Tube
•
With quartz tube inside ceramic furnace, slide Ultra Torr nut, ferrule, and Kalrez O-ring
over the end of quartz tube. (1, 2, 3)
•
Gently slide quartz tube into Ultra Torr elbow. (4)
•
Align threads of elbow and nut, then tighten the nut FINGER TIGHT.
3.1.2 Leak Checking Furnace
•
Cap the outlet of the furnace to begin the leak check.
•
Set the pressure of inlet to 15 psig and open the flow meter to maximum value.
•
When the ball in the flow meter drops to the bottom of the flowmeter tube, a seal has
been established.
If the ball does not drop, a leak is present. Inspect and tighten all fittings, then repeat the
previous steps until a seal has been established.
CAUTION: Do not operate the reaction furnace if a leak is present.
Figure 2. High Temperature O-Rings and Ultra Tor Elbow/Fittings
Содержание 330S
Страница 2: ......
Страница 15: ...Total Sulfur Option User Manual Revision 1 0 11 330S with Mode Switching Outline Dimensional ...
Страница 17: ...Total Sulfur Option User Manual Revision 1 0 13 331S Total Sulfur Outline and Dimensional ...
Страница 18: ...Total Sulfur Option User Manual Revision 1 0 14 Total Sulfur Oven Break Down ...
Страница 23: ......