42
IP2160EN - 2017-04-12
NB: Make sure that the distance between the pinion centre and tie rod [F] is correct when the
gate is fully open and closed.
-
Secure the chain with nuts [G].
-
Tighten the chain [E] with the tie rods [F].
-
Slightly lubricate the chain [E] and the pinions after assembly.
WARNING: when the chain traction kit is fitted, the gearmotor drive direction is inverted.
Right-hand opening
Left-hand opening