background image

Features

Enterasys S-Series S8 Chassis Hardware Installation Guide 1-3

Figure 1-2  S8 Chassis with Four Bay PoE Subsystem (S8-Chassis-POE4)

1

Chassis (S8-Chassis)

2

PoE power supply slots
(S-POE-PS) (4)

3

AC power receptacles

Содержание S4-Chassis

Страница 1: ...P N 9034438 05 Enterasys S Series S8 Chassis Hardware Installation Guide S8 Chassis S8 Chassis POE4 S8 Chassis POE8...

Страница 2: ......

Страница 3: ...MA 01810 2010 Enterasys Networks Inc All rights reserved Part Number 9034438 05 January 2010 ENTERASYS ENTERASYS NETWORKS ENTERASYS SECURE NETWORKS and any logos associated therewith are trademarks o...

Страница 4: ...dustry Canada Notice This digital apparatus does not exceed the class A limits for radio noise emissions from digital apparatus set out in the Radio Interference Regulations of the Canadian Department...

Страница 5: ...ipal waste It must be collected and treated separately 3 It has been determined by the European Parliament that there are potential negative effects on the environment and human health as a result of...

Страница 6: ...s is above the relevant threshold of the SJ T 11363 2006 standard This table shows where these substances may be found in the supply chain of Enterasys electronic information products as of the date o...

Страница 7: ...e fiber under normal conditions is 12 6 dBm or 55 x 10 6 watts Removing the optical connector from the transceiver allows laser radiation to emit directly from the optical port The maximum radiance fr...

Страница 8: ...y Business Park London Road Newbury Berkshire RG14 2PZ England Conformance to Directive s Product Standards EC Directive 2004 108 EC EN 55022 2006 EN 55024 1998 EN 61000 3 2 2006 EN 61000 3 3 1995 EC...

Страница 9: ...ssemble electronically transfer or reverse engineer the Licensed Software or to translate the Licensed Software into another computer language The media embodying the Licensed Software may be copied b...

Страница 10: ...obligation under this Agreement including a failure to pay any sums due to Enterasys or in the event that You become insolvent or seek protection voluntarily or involuntarily under any bankruptcy law...

Страница 11: ...es do not allow limitations on how long an implied warranty lasts and some states do not allow the exclusion or limitation of incidental or consequential damages so the above limitation and exclusion...

Страница 12: ...x...

Страница 13: ...stalling the S8 Chassis 3 3 Order of Installation 3 3 Installing Rubber Feet 3 4 Installing the Mid mount Brackets 3 4 Rack Mounting the S8 Chassis 3 6 Front Mounting an S8 Chassis 3 7 Mid Mounting an...

Страница 14: ...sis POE4 1 3 1 3 S8 Chassis with Eight Bay PoE Subsystem S8 Chassis POE8 1 4 3 1 Attaching the Mid mount Brackets to the Sides of the Chassis 3 4 3 2 Attaching the Mid mount Brackets to the Front of t...

Страница 15: ...nd Their Definitions 3 26 3 6 S POE PS Power Supply LED Status Definitions 3 27 A 1 S8 Chassis Specifications A 1 A 2 S AC PS Power Supply Specifications A 2 A 3 S POE PS Power Supply Specifications A...

Страница 16: ...xiv...

Страница 17: ...Definitions of the conventions used in this document Instructions regarding how to obtain technical support from Enterasys Networks To locate information about various subjects in this guide refer to...

Страница 18: ...he text in blue to go to the referenced figure table or section Lowercase x Indicates the general use of an alphanumeric character Note Calls the reader s attention to any item of information that may...

Страница 19: ...network environment such as layout cable type other relevant environmental information Network load and frame size at the time of trouble if known The device history for example if you have returned...

Страница 20: ...Getting Help xviii About This Guide...

Страница 21: ...6 centimeter 19 inch rack All chassis components power supplies fan tray and modules are installed from the front of the chassis for ease of maintenance All LED indicators are observable from the fron...

Страница 22: ...Features 1 2 Introduction Figure 1 1 S8 Chassis S8 Chassis 1 Module slots 8 total 4 Fan trays S FAN 2 USB ports 3 ports 5 Power supply slots S AC PS 4 3 Slot specific COM ports 3 ports...

Страница 23: ...Enterasys S Series S8 Chassis Hardware Installation Guide 1 3 Figure 1 2 S8 Chassis with Four Bay PoE Subsystem S8 Chassis POE4 1 Chassis S8 Chassis 2 PoE power supply slots S POE PS 4 3 AC power rec...

Страница 24: ...Features 1 4 Introduction Figure 1 3 S8 Chassis with Eight Bay PoE Subsystem S8 Chassis POE8 1 PoE power supply slots S POE PS 8 2 Chassis S8 Chassis...

Страница 25: ...dependent power circuit The S AC PS is capable of load sharing the S8 chassis power load If a power supply fails the other power supplies support the entire load of the chassis without interruption to...

Страница 26: ...freestanding unit on a shelf or table The S8 chassis can also be mounted into a standard 48 26 centimeter 19 inch equipment rack In a rack installation the S8 chassis can be either front mounted or m...

Страница 27: ...the total power needed does not exceed the power output capability of the remaining S POE PSs in the PoE subsystem Provides a maximum power output of 1200W low line or 2000W high line to each S Serie...

Страница 28: ...Features 1 8 Introduction...

Страница 29: ...t care must be taken to ensure that the rack used will support the unit and that the rack remains stable To allow proper air flow and cooling within the rack ensure the following If multiple products...

Страница 30: ...mulated dust periodically from the vent holes on the right side of the S8 chassis Precautions Ensure that you have read and understood the installation and operation precautions before installing the...

Страница 31: ...on Elektrischer Gefahrenhinweis Installationen sollten nur durch ausgebildetes und qualifiziertes Personal vorgenommen werden For information about Refer to page Required Tools 3 1 Unpacking the S8 Ch...

Страница 32: ...e bag down around the chassis 7 Lift and remove the chassis from the skid Save all shipping materials for future reshipping if necessary 8 Inspect the chassis for any signs of physical damage If there...

Страница 33: ...S8 chassis start at step 2 2 Optional Install the mid mount brackets Installing the Mid mount Brackets 3 Mount the chassis in a 48 26 centimeter 19 inch rack or other secure location Rack Mounting th...

Страница 34: ...apped holes Installing the Mid mount Brackets To install the mid mount brackets on the S8 chassis 1 Attach the mid mount brackets to each side of the S8 chassis with the six 1 4 20 x 3 8 pan head scre...

Страница 35: ...the front of the S8 chassis with the twelve 10 32 pan head screws supplied with the mid mount bracket kit six screws for each bracket See Figure 3 2 Figure 3 2 Attaching the Mid mount Brackets to the...

Страница 36: ...ps prevent the rack from being top heavy Advertencia Si el rack no esta asegurado al piso es recomendable que instales el chasis en la parte de abajo del rack Esto ayuda a prevenir que el rack este de...

Страница 37: ...d working toward the top of the chassis See Figure 3 3 Figure 3 3 Front Mounting the S8 Chassis in a Rack Warning To help prevent personal injury at least two people are required to lift the chassis i...

Страница 38: ...ou must install the mid mounting brackets on the S8 chassis before installing the S8 chassis in the rack See Installing the Mid mount Brackets on page 3 4 Warning To help prevent personal injury at le...

Страница 39: ...hips with nine cable management clips which you install on the left front mounting bracket of the chassis after you have installed the chassis A completed installation creates eight separate cable man...

Страница 40: ...m See Figure 3 6 Figure 3 6 Removing the Swing Arm from the Bottom Cable Management Clip 3 Install the bottom cable management clip on the left mounting bracket 4 Close each cable management clip by s...

Страница 41: ...8 shows the completed installation Figure 3 8 S8 Chassis with Cable Management Clips 5 Once you have installed and cabled an S Series module open the appropriate cable management clip by pushing up o...

Страница 42: ...sis 3 12 Chassis Setup Figure 3 9 Opening a Cable Management Clip 6 Place the bundled cables in the cable management clip 7 Close the cable management clip 1 Push up on the swing arm latch to open the...

Страница 43: ...the chassis and the enclosure metalwork a nearby point on the Central Office CO Ground system or earth ground The connection is made using one or more grounding wires as needed fabricated from an 8 AW...

Страница 44: ...ng an S AC PS Power Supply S AC PS power supplies provide two power output levels relative to the input power source The power supplies draw either 110 Vac 12A or 220 Vac 6A service providing 1200 or...

Страница 45: ...ither a backup battery or another power source separate from the first power source The number of power supplies required in an S8 chassis is determined by the number and types of modules installed in...

Страница 46: ...stall a single power supply you must install it in the power supply slot labeled PS1 To install the S AC PS power supplies 1 Attach the anti static wrist strap as described in Attaching the Electrosta...

Страница 47: ...front panel should be flush with the face of the S8 chassis If significant resistance is encountered before the front panel is flush remove and reinsert the power supply Do not force the power supply...

Страница 48: ...up the S8 Chassis for instructions to power up the chassis Removing an S AC PS Power Supply Whenever possible you should install a replacement power supply before removing a power supply To remove an...

Страница 49: ...oving a Fan Tray To remove a fan tray 1 Attach the anti static wrist strap as described in Attaching the Electrostatic Discharge Wrist Strap on page 3 14 before handling the fan tray 2 Loosen the capt...

Страница 50: ...side up 3 Line up the top and bottom of the fan tray with the slot guides on the chassis 4 Slide the fan tray into the chassis until the faceplate of the tray is flush with the face of the S8 chassis...

Страница 51: ...ly by removing it from the shipping box and sliding the two foam end caps off the unit Save the shipping box and materials in the event the unit must be reshipped 2 Verify the contents of the box usin...

Страница 52: ...PS power supply by releasing the spring clip on the lower left of the faceplate 2 Align the power supply with bay 1 labeled PS1 then slide the S POE PS power supply forward until the S POE PS power s...

Страница 53: ...e power supplies The PoE subsystem ships without a cover on bay 1 5 Repeat steps 1 through 3 for each additional power supply Removing an S POE PS Power Supply To remove an S POE PS power supply 1 Att...

Страница 54: ...ector on the PoE shelf The AC inlet connectors are numbered 2 Plug the other end of the AC power cord into a separately fused AC power outlet that meets the power specifications provided in Appendix A...

Страница 55: ...nd an AC OK LED indicating incoming AC line voltage is sufficient or has fallen below operational limits Refer to Figure 3 17 for the location of the power supply LEDs Table 3 4 describes the differen...

Страница 56: ...ating normally Amber One fan in the fan tray has failed Caution If a fan in the fan tray fails you must replace the fan tray as soon as possible to ensure the proper and continued operation of the cha...

Страница 57: ...power supply LEDs Figure 3 19 S POE PS Power Supply LEDs 1 AC Input 2 DC Output 3 Temperature 4 Fault Table 3 6 S POE PS Power Supply LED Status Definitions LED LED State Status AC Input On Sufficient...

Страница 58: ...UTP cable and an optional RJ45 to DB25 female adapter you can connect to an S8 chassis RJ45 COM port to a VT series terminal or VT type terminals running emulation programs for the VT series Connecti...

Страница 59: ...that you connect to must have an I O fabric module in the corresponding slot 2 Plug the RJ45 connector at the other end of the cable into the RJ45 to DB25 female adapter 3 Connect the RJ45 to DB25 ad...

Страница 60: ...5 Green 5 Ground GRD 2 Orange 7 Request to Send RTS 6 Yellow 8 Clear to Send CTS VT Series Port Adapter Wiring and Signal Diagram RJ45 DB25 Pin Conductor Pin Signal 4 Red 2 Transmit TX 1 Blue 3 Recei...

Страница 61: ...information about setting the IP address and configuring Telnet settings for remote access to S8 chassis management refer to the Enterasys S Series Configuration Guide The CLI commands enable you to i...

Страница 62: ...Completing the Installation 3 32 Chassis Setup...

Страница 63: ...ort mtbf S8 Chassis Specifications Table A 1 S8 Chassis Specifications Item Specification S8 Chassis Dimensions 63 96 cm x 44 70 cm x 47 32 cm 25 19 x 17 60 x 18 63 Weight 36 06 kg 79 5 lbs S8 Chassis...

Страница 64: ...at 1200 watts 200 to 240 Vac 10 A at 1600 watts Physical Dimensions 41mm x 101 6mm x 406 4mm 1 60 x 4 00 x 16 00 Weight 2 38 kg 5 25 lbs Table A 3 S POE PS Power Supply Specifications Item Specificat...

Страница 65: ...nts Table A 5 Recommended Torque Values by Screw Size Screw Size Torque in Pounds Bit Size English Metric 5 Nominal 5 N A N A 1 42 1 5 1 57 0 2 56 1 5 2 85 3 0 3 15 0 4 40 2 5 4 75 5 0 5 25 0 1 6 32 3...

Страница 66: ...Safety UL 60950 1 FDA 21 CFR 1040 10 and 1040 11 CAN CSA C22 2 No 60950 1 EN 60950 1 EN 60825 1 EN 60825 2 IEC 60950 1 2006 95 EC Low Voltage Directive Electromagnetic Compatibility EMC FCC 47 CFR Pa...

Страница 67: ...of PoE have been deployed by LAN equipment vendors in 2003 the IEEE published the IEEE 802 3af 2003 specification which is part of the 802 3 suite of standards The S Series chassis that support PoE ar...

Страница 68: ...power due to a change in power supply status or redundancy mode will trigger an automatic redistribution of power Manual mode in which the power budget is manually configured using either CLI command...

Отзывы: