
Out-of-Band NAC Design Procedures
Enterasys NAC Design Guide 5-27
Figure 5-7 Service for the Assessing Role
Note
that
it
is
not
mandatory
to
assign
the
Assessment
Policy
to
a
connecting
end
‐
system
while
it
is
being
assessed.
NAC
can
be
configured
to
assign
the
policy
role
received
from
the
RADIUS
server
or
the
Accept
Policy
to
the
end
‐
system
while
it
is
being
assessed.
In
this
way,
the
end
‐
system
can
be
granted
immediate
network
access
without
mandating
that
the
end
user
wait
for
assessment
to
be
complete
before
full
network
resource
allocation
is
granted.
If
NAC
is
configured
to
return
the
policy
role
received
from
the
RADIUS
Server,
it
is
necessary
that
the
enterprise
ʹ
s
business
‐
specific
policy
roles
are
configured
to
allow
access
to
the
appropriate
network
resources
for
communication
with
the
assessment
servers
during
assessment.
This
can
be
implemented
by
associating
the
Assessing
service
shown
in
Figure 5
‐
7
to
all
business
‐
specific
policy
roles
in
the
NetSight
Policy
Manager
configuration.
Quarantine Policy
The
Quarantine
Policy
is
used
to
restrict
network
access
to
end
‐
systems
that
have
failed
assessment.
For
Enterasys
policy
‐
enabled
switches,
a
corresponding
Quarantine
policy
role
(created
in
Policy
Manager)
should
deny
all
traffic
by
default
while
permitting
access
to
only
required
network
resources
such
as
basic
network
services
(ARP,
DHCP,
and
DNS).
If
the
NAC
deployment
implements
remediation,
the
services
associated
to
the
Quarantine
Policy
must
be
configured
to
allow
all
HTTP
traffic
onto
the
network,
in
addition
to
other
basic
IP
services
such
as
ARP,
DNS,
and
DHCP
as
shown
in
Figure 5
‐
8
.
Содержание 9034385
Страница 1: ...Enterasys Network Access Control Design Guide P N 9034385...
Страница 2: ......
Страница 4: ...ii...
Страница 8: ...vi...
Страница 22: ...Summary 1 12 Overview...
Страница 98: ...Additional Considerations 5 34 Design Procedures...