LEDs
Enterasys 7100G-Series Hardware Installation Guide
3-5
\
describes the CPU LED when the 7100G-Series switch is in a virtual switch bonding
configuration.
Table 3-5
CPU LED in Virtual Switch Bonding (VSB) Configuration
Power Supply LED
The 71A-PS-A/B power supplies have a single LED and 71A-POE-A/B power supplies have two
LEDs.
describes the different states of the power supply LEDs.
Blue
Blinking
. Virtual Switch Bonding is enabled, but the
devices are not bonded
None.
Solid
. Virtual Switch Bonding is enabled, and the
devices are bonded.
None.
PWR
Off
The 7100G-Series switch is not receiving power from
the power supplies.
Ensure the power cords are plugged in
and power is available at the source.
Contact Enterasys Networks for technical
support.
Green
Functional
. Indicates one of the following conditions:
•
A single power supply is present and operating
normally.
•
Two power supplies are present and operating
normally.
None.
Amber
One of the following conditions has occurred:
•
Two power supplies are present but only one is
operating normally while the other is not
connected.
•
Two power supplies are present but only one is
operating normally while the other indicates a
fault.
•
Both power supplies are faulty but the 7100G-
Series switch is still receiving power.
•
Power supplies are operating in additive (non-
redundant) mode.
•
Other internal fault.
Ensure the power cords are plugged in
and power is available at the source.
Contact Enterasys Networks for technical
support.
Table 3-4
System LEDs (continued)
LED
Color
State
Recommended Action
Note:
The PWR LED status indication is based on power supplies being powered on.
Color
State
Green and Blue
Blinking
. Image has started and found chassis bonding enabled.
Blue
Solid
. Functional (bonding is operational and ready to switch).
Blue
Blinking
.
Bonding is not functional (non-operational).
Содержание 7100G Series
Страница 2: ......
Страница 12: ...x...
Страница 20: ...Getting Help xviii About This Guide...
Страница 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Страница 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Страница 62: ...Regulatory Compliance A 4 Specifications...
Страница 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...