Installing the Power Supplies
Enterasys 7100G-Series Hardware Installation Guide
2-13
3.
Holding the power supply by the handle and bottom, align the power supply with the left
power supply bay (labeled PS1).
4.
Slide the power supply forward until it is plugged into the chassis connector and the lock tab
clicks to the right. Pull on the power supply handle to ensure that the power supply is firmly
in place. See
Figure 2-9
Installing a Power Supply
5.
If you are installing a second power supply, remove the coverplate from the right power
supply bay by unscrewing the screw that attaches the coverplate to the 7100G-Series switch
and rotating the coverplate out of its position from right to left before disengaging it from the
chassis (see
on page 2-14). Reinstall the screw once the cover plate is removed.
1
Lock Tab
Содержание 7100G Series
Страница 2: ......
Страница 12: ...x...
Страница 20: ...Getting Help xviii About This Guide...
Страница 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Страница 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Страница 62: ...Regulatory Compliance A 4 Specifications...
Страница 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...