
10/12
HJHP33.24
PEM1268ENG
2012-02
24.
Wrap tinned copper tape over the armouring. Fix the copper tape to armouring by knotting it.
Set the two ground copper braids on the tinned copper tape on the lead or aluminium sheath
(on the opposite sides of cable joint) so that the braids ends are on the same line as interface of
outer sheath and armouring. Spread the end of copper braid and fix it on the possible armour with
constant force spring (1 pc / joint side). Fix the copper braid on lead sheath with constant force
springs (2 pcs / joint side). Tighten the constant force springs and wrap SSITA42 tape on them us-
ing 1 tape / 1 constant force spring. Wrapping direction should be chosen so that the springs will
get tightened.
25.
Use some PVC tape to keep the braid on the joint. Wrap two layers of sealing mastic PA22 on the
both sides of joint so, that 50 mm of outer covering will be covered, armouring, lead sheath and
constant force spring areas will be covered as well.
PVC-tape
PVC-tape
PVC-tape
Sealing mastic (PA22)
Sealing mastic (PA22)
Sealing mastic (PA22)
50
50
Sealing mastic (PA22)
Tinned copper tape (8 rounds)
Tinned copper braid
SSITA42 tape
Tinned zone
30
30