Установочная инструкция для продукта ensto HJHP33.2402 доступна для загрузки совершенно бесплатно на нашем сайте. Пользователи могут легко скачать руководство по установке и использованию данного изделия. Не забудьте загрузить его с {веб-сайта}.
INSTALLATION INSTRUCTION
PEM1268ENG
2012-02
ENGLISH
HEAT SHRINK JOINTS H-CABLE VS H-CABLE
HJHP33.2402, HJHP33.2402C, HJHP33.2403, HJHP33.2403C
Страница 1: ...INSTALLATION INSTRUCTION PEM1268ENG 2012 02 ENGLISH HEAT SHRINK JOINTS H CABLE VS H CABLE HJHP33 2402 HJHP33 2402C HJHP33 2403 HJHP33 2403C...
Страница 2: ...instructions and the relevant sequence to avoid trapped air Check that the tube has shrunk evenly around the cable before you continue shrinking If the tube turns around at the end of shrinking strai...
Страница 3: ...Protect the outer covering for example with plastic sleeve Roughen the armouring up to length of 300 mm from armouring with grinding paper Roughen the outer covering or sheath around 75 mm Clean the l...
Страница 4: ...ation shield side The tape must be applied with 50 overlap and by stretching it to half of its original width Wrap two layers of stress control tape SSCTA85 on the boundary of insulation shield and in...
Страница 5: ...lowing the con nector manufacturer s instructions Be careful not to nick the conductor when removing the last paper layers Clean the conductors and wrap some layers of PVC tape on them SSET SSET SSET...
Страница 6: ...tape SSCTA85 on the belt paper insulation starting from the lead or aluminium sheath Cover 20 mm of the lead or aluminium sheath and continue to cover 50 mm of the cores The tape must be applied with...
Страница 7: ...owing the manufacturer s instructions Round the sharp angles Please note that a sector shaped conductor may need to be rounded to fit into the connector 16 Fill any holes left in the connector with gr...
Страница 8: ...be from the middle and move towards the ends Clean the surface of the stress control tube after shrinking SSET SISCT SSET 20 Wrap two layers of stress control tape SSCTA85 length of 30 mm on the semic...
Страница 9: ...leaving 120 mm of the lead or aluminium sheath uncovered Tinned copper tape must be applied with a 20 overlap Fix the end of the tape by knotting it 23 Wrap PA22 mastic to cover 40 mm length of lead s...
Страница 10: ...on lead sheath with constant force springs 2 pcs joint side Tighten the constant force springs and wrap SSITA42 tape on them us ing 1 tape 1 constant force spring Wrapping direction should be chosen s...
Страница 11: ...ing paper Wrap one layer of sealing mastic PA22 on the tube for 50 mm length in the outer end of the roughened area CPEEPL CPEEPL 27 Slide the bigger CPEEPL or CPEEL sealing tube so that it overlaps t...
Страница 12: ...ENSTO FINLAND OY ENSIO MIETTISEN KATU 2 P O BOX 77 06101 PORVOO FINLAND TEL 358 204 76 21 FAX 358 204 762 770 UTILITY NETWORKS ENSTO COM WWW ENSTO COM PEM1268ENG Issue 2012 02 01 UTILITY NETWORKS...