To install the Enphase M250 and M215 Microinverters™ read and follow all warnings and instructions in this guide and in the 

Enphase M250 and M215 

Microinverter Installation and Operation Manual

 at: 

enphase.com/support

. Safety warnings are listed on the back of this guide.

Because ground fault protection (GFP) is integrated into the M250 and M215 microinverters, the models listed in this guide do not require a grounding elec-

trode conductor (GEC) between microinverters. To support GFP, use only PV modules equipped with DC cables labeled 

PV Wire

 or 

PV Cable

.

D )  Check that you have these 

other items

:

• 

Outdoor-rated, weather-proof AC junction box(es)

• 

Gland or strain relief fitting (one per AC junction box)

• 

Number 2 and 3 Phillips screwdrivers

• 

Torque wrench, sockets, wrenches for mounting hardware

• 

Adjustable wrench or open-ended wrench (for terminators)

• 

Hand-held mirror (to view LEDs on the undersides of the  

microinverters)

E )  Protect your system with lightning and/or surge suppression devices. It 

is also important to have insurance that protects against lightning and 

electrical surges. 

F )  Plan your AC branch circuits to meet the following limits for maximum 

number of microinverters per branch when protected with a 20-amp 

maximum over-current protection device (OCPD). 

Service type

Max. M250s per 

branch circuit

Max. M215s per 

branch circuit

Single-phase 240 VAC 16

17

Three-phase 208 VAC 24

25

G )  Size the AC wire gauge to account for voltage rise. Select the correct 

wire size based on the distance from the beginning of the microinverter 

AC branch circuit to the breaker in the load center. Design for a voltage 

rise total of less than 2% for the sections from the microinverter AC 

branch circuit to the breaker in the load center. Refer to the Voltage Rise 

Technical Brief at 

enphase.com/support

 for more information. 

 

Best practice:

 Center-feed the branch circuit to minimize voltage rise in 

a fully-populated branch.

PREPARATION

A )  Download the Enphase Installer Toolkit™ mobile app and 

open it to log in to your Enlighten account. With this app, 

you can scan microinverter serial numbers and connect 

to the Envoy-S to track system installation progress. To 

download, go to 

enphase.com/toolkit

 or scan the QR code at right.

B )  Refer to the following table and check PV module electrical compatibility 

at: 

enphase.com/en-us/support/module-compatibility.

 

Microinverter model

PV module cell count

M215-60-2LL-S22-IG 

M250-60-2LL-S22 

M250-60-2LL-S25

Pair only with 60-cell modules.

M250-72-2LL-S22 

M250-72-2LL-S25 

M250-72-2LL-S22-US

Pair with 60- or 72-cell modules.

 

To ensure mechanical compatibility, order the correct connector type 

(MC-4 locking or Amphenol H4) for both microinverter and PV module 

from your distributor.

C )  In addition to the Enphase Microinverters, PV modules and racking, you 

will need these 

Enphase items

:

• 

Enphase Envoy or Envoy-S™ communications gateway (required to 

monitor solar production)

• 

Enphase Engage Cable™, single-phase 240 VAC or three-phase 208 

VAC, as needed

• 

Tie wraps or cable clips

• 

Enphase Sealing Caps (for any unused drops on the Engage Cable)

• 

Enphase Terminators (one needed at the end of each AC branch 

circuit)

• 

Enphase Disconnect Tool (number 2 and 3 Phillips screwdrivers can 

be substituted)

AC connector

Enphase

Microinverter

DC

connectors

AC

junction box

terminator

Engage

Cable

Tie wraps or

cable clips

AC drop on

Engage Cable

How It Fits Together

© Enphase Energy, Inc. All rights reserved.

Содержание M215-60-2LL-S22-IG

Страница 1: ...reaker in the load center Design for a voltage rise total of less than 2 for the sections from the microinverter AC branch circuit to the breaker in the load center Refer to the Voltage Rise Technical Brief at enphase com support for more information Best practice Center feed the branch circuit to minimize voltage rise in a fully populated branch PREPARATION A Download the Enphase Installer Toolki...

Страница 2: ...lectricity network connection using equipment and practices as required by local jurisdictions 2 WARNINGS Install the microinverter under the PV module to avoid direct exposure to rain UV and other harmful weather events Do not mount the microinverter upside down or in a vertical position that allows water to collect in the DC connector recess as it may have a harmful effect on the long term endur...

Страница 3: ...ing the microinverters Connecting to Enlighten Registering the system Building the virtual array Connect the PV Modules Mount the PV modules above the microinverters A Connect the DC leads of each PV mod ule to the DC input connectors of the corresponding microinverter B Check the LED on the underside of the microinverter The LED flashes six times when DC power is applied Energize the System A If ...

Страница 4: ... allow contamination or debris in the connectors Use the terminator cap and cable connections only when all parts are present and intact Do not install or use in potentially explosive environments Do not allow the terminator to come into con tact with open flame Make sure that all terminator cap seals are seated correctly in the wire organizer Fit the terminator cap using only the prescribed tools...

Страница 5: ...om Use this map to build the virtual array in Enlighten s Array Builder Escanee el mapa completo y cárguelo en Enphase Haga clic en Añadir nuevo sistema en https enlighten enphaseenergy com Utilice este mapa para crear el conjunto de paneles virtual en el Creador de conjuntos de paneles de Enlighten A B C D E F G H J K L M 1 2 3 4 5 6 7 To Sheet A la hoja de ________ To Sheet A la hoja de ________...

Отзывы: