enphase EP200G-NA-02-RSD Скачать руководство пользователя страница 1

Figure 1: Layout of auxiliary contacts in Enpower, Terminals for connecting RSD are indicated in red

Each Enphase Storage system with IQ8 PV requires the presence of a rapid shutdown (RSD) switch. Rapid shut down switch is needed to disconnect 

all PV panels, battery and generator systems in the building/home to ensure the safety of maintenance technicians. When the RSD switch is engaged, 

the Enphase storage system will be shutdown and the home is connected to the grid. 

  Q U I C K

  I N S T A L L  

G U I D E

 

Model number: 

EP200G-NA-02-RSD

 

Instructions to use the 

Rapid shutdown 

(RSD) switch connections

The contents of the Rapid shurdown (RSD) switch connections  and how to use 

them

 

are

 

described below:

  

   Components that are needed for RSD connection 

S.No

Component

Source of Components

Qty

1

RSD switch

RSD kit (SKU: EP200G-NA-

02-RSD)

1

2

NEC label 1

RSD kit (SKU: EP200G-NA-

02-RSD)

1

3

NEC label 2

RSD kit (SKU: EP200G-NA-

02-RSD)

1

4

Cable head assembly

Enpower R2 literature kit

4

5

12 AWG wire (for RSD 

connections)

Provided by Installer

Length as 

required

6

8-14 AWG wire (for 

Ground bar) 

Provided by Installer

Length as 

required

7

Screw drivers (PZ2)

Provided by Installer

1

    Wiring the auxiliary contacts in Enpower R2

A )  The Enpower R2 comes with multiple auxiliary contacts as indicated 

in Figure 1.

B )  The contacts NC3 and NC4 are for wiring the RSD (indicated in the 

red box in Figure 1).

C )  The Enpower literature kit comes with cable assembly header which 

is shown in Figure 2a.

D )  Insert the ferrule of the cable header assembly to the feed through 

header which is indicated in Figure 2b.

E )  Tighten the screws on the top (torque 0.22Nm to 0.25Nm) to secure 

the wires.

F )  Repeat steps D and E to complete wiring of other 3 terminals of 

NC3 and NC4.

© 2021 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enpower smart switch, Encharge storage system, Envoy, Combiner, Microinverter, 

Installer Toolkit, Enlighten and other trademarks or service names are trademarks of Enphase Energy, Inc. Data subject to change. 10-18-2021

2

1

 200 ±5 

 15 ±5 

1

2

3

(SEE NOTE : 6)

COLOR RING 

STEP-DOWN END

NOTES:

APPLICABLE STANDARDS:

1.

IPC/WHMA-A-620: CLASS 2 REQUIREMENTS AND ACCEPTANCE

FOR CABLE AND WIRE HARNESS ASSEMBLIES.

WIRE IS TO BE TERMINATED ON AN AUTOMATIC MACHINE. THE APPLICATORS OR CRIMPING APPARATUS TO BE AS

2.

SPECIFIED BY THE TERMINAL MANUFACTURER. TERMINAL CRIMPS MUST WITHSTAND A MINIMUM PULLOUT FORCE

AS PER STANDARD UL 486A.

MUST BE MANUFACTURED UNDER UL RECOGNISED COMPONENT WIRING HARNESS (ZPFW2) PROGRAM.

3.

 UL MARKINGS MUST BE ON SMALLEST SHIPPING CARTON.

4.

EACH SHIPMENT SHALL INCLUDE A CERTIFICATE THAT:

- INCLUDES THE UL WIRE STYLE(S)

- THE CONNECTOR MANUFACTURER'S NAME AND PARTNUMBER AND

- REFERENCES THE PURCHASE ORDER AND ENPHASE ENERGY DRAWING NO.

USE OF LOOSE PIECES OR HAND FEED TERMINATION IS NOT ACCEPTABLE.

5.

LABEL WITH CABLE PART NUMBER, REVISION AND MANUFACTURE ID.

6.

REVISIONS

REV

DESCRIPTION

CHECKED

DATE

01

INITIAL RELEASE : ECO-005253

HW

27 APR 21

A3

EPDM VERSION

© COPYRIGHT 2019 ENPHASE ENERGY. ALL RIGHTS RESERVED. ALL THE 

TRADEMARKS ARE OWNED BY ENPHASE OR ITS AFFILIATED COMPANIES AND 

SHALL NOT BE USED OR REPRODUCED IN ANY FORM OR FOR ANY PURPOSE 

WHATSOEVER, WITHOUT THE EXPRESS WRITTEN PERMISSION OF ENPHASE 

ENERGY.

FINISHED PART (INCLUDING ALL SUB-COMPONENTS) MUST 

BE ROHS COMPLIANT (EU ROHS DIRECTIVE 2015/863/EU). 

MANUFACTURER WILL BE REQUIRED TO CERTIFY ROHS 

COMPLIANCE. IF THERE IS A CONFLICT BETWEEN THE 

SPECIFICATIONS AND ROHS COMPLIANCE, THE VENDOR

MUST CONTACT ENPHASE ENERGY FOR CLARIFICATION.

MASS(g)

FINISH

MATERIAL

ALL DIMENSIONS ARE IN MILLIMETERS.   

Cable Assy Header Enpower 200G R2

27 APR 21

PROPRIETARY AND CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

ENPHASE ENERGY. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE 

WRITTEN PERMISSION OF ENPHASE ENERGY IS PROHIBITED.

HENRY W

27 APR 21

DATE

DATE

ENGINEER

2:1

SCALE

TOLERANCES AND DIMENSIONS IN 

ACCORDANCE WITH ASME Y14.5 (2009) 

HENRY W

DRAWN

840-01451

01

THIRD ANGLE 

PROJECTION

SHEET

SIZE

TITLE

SHEET

PART  NUMBER

REV

1 of 1

DO NOT SCALE 

INDIQUBE GOLFVIEW

BANGALORE, INDIA

WWW.ENPHASE.COM

A

A

B

B

C

C

D

D

E

E

F

F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

Figure 2a: Cable header assembly 

2. Tighten these 

screws to hold the 

wires in place

1. Insert wires 

here

Figure

 2b: Feed through header 

I/O - 1

(24V, 1A)

I/O - 2 

(24V, 1A)

Gen - I/O

(24V, 1A)

NO1 NO2

NC1 NC2

NO3

RSD 

NC3 NC4

AC Combiner 

PV/Storage

Generator

Содержание EP200G-NA-02-RSD

Страница 1: ...F Repeat steps D and E to complete wiring of other 3 terminals of NC3 and NC4 2021 Enphase Energy All rights reserved Enphase the Enphase logo Enpower smart switch Encharge storage system Envoy Combiner Microinverter Installer Toolkit Enlighten and other trademarks or service names are trademarks of Enphase Energy Inc Data subject to change 10 18 2021 2 1 200 5 15 5 1 2 3 SEE NOTE 6 COLOR RING STE...

Страница 2: ...the RSD A Identify a location which is near the Enpower smart switch to mount the RSD Please note that Enpower and RSD cannot be more than 200 ft apart B There are 2 mounting points on the back plate of the enclosure They are marked by red boxes in Figure 4 below C Installers can use any type of mounting as long as they are not exceeding the diameter of each fixing point D It is recommended that i...

Страница 3: ...s shut down and the regulatory requirement for rapid shut down are also met NOTE For more details of the RSD switch options and wiring instruc tions please refer to Enpower R2 QIG or the Ensemble R2 design guide 8 Complete the installation by affixing the labels A In order to identify the Rapid shut down switch the following label in Figure 7 needs to be pasted at a distance of not more than 3ft 1...

Страница 4: ...e only with the IQ Envoy or Envoy S metered communications gateway properly fitted with USB hub USB radios and production and Consumption PCS CTs The Envoy is required for operation of the Enpower Earlier versions of the Enphase Envoy commu nications gateway are incompatible NOTE The Enphase Enpower is intended to operate with an Internet connec tion through the Envoy Failure to maintain an Intern...

Отзывы: