6.  MAINTENANCE 

 

6.1 

ORDINARY MAINTENANCE ACTIVITIES (GENERAL INFORMATION) 

6.1.1  Technical warnings for good maintenance 

For good maintenance: 
- use only original spare parts, suitable equipment for the task and in good conditions; 
- respect the frequency of interventions indicated in the manual for programmed maintenance (preventative 

and periodic); 

- good preventative maintenance requires constant attention and continuous surveillance of the machine. 

Immediately  check  the  cause  of  eventual  anomalies  such  as  excessive  noise,  overheating,  etc.  and 
attempt to remedy. 

 
In case of doubts, consult the constructor or the authorised assistance centre. 

6.1.2  Maintenance plan 

From a structural point of view, the interventions regarding the mechanical and electrical parts. 
From an operational point of view, for the person performing the maintenance, the operations are divided 
into two categories: 
- ordinary programmed (or preventative) maintenance; 
- ordinary maintenance according to condition. 
 
Ordinary programmed (periodic or preventative) maintenance includes inspections, controls and 
interventions which, to prevent stops and malfunctions, keep the mechanical conditions of the machine, 
and in particular its operations, under systematic control. 
 
Ordinary maintenance according to condition refers to the components of the machine for which wear times 
or intervention times cannot be pre-established. 
These components should be kept under control and replaced when wear status makes them unsuitable 
for use. 

 

6.2 

ORDINARY MAINTENANCE 

To keep the machine running at full capacity, please follow the maintenance schedule as indicated. The lack in 
conformity with the above exonerates the constructor from any and all responsibility in respect to the guarantee. 
 

         NOTE: The indicated frequency refers to normal functioning conditions, i.e. it corresponds to foreseen 

and contractually established working conditions. 

 

TYPE OF OPERATION 

FREQUENCY 

START OF WORKING CYCLE 

END OF WORKING CYCLE 

Clean the machine 

 

Tightness and welding control 

YEARLY 

Button efficiency control (mod. GE/PE) 

 

Check electrical cables (mod. GE/PE) 

Содержание BACCO 2

Страница 1: ...FILLER BACCO 2 4 6 CONNECTIONS INSTRUCTION MANUAL AND SPARE PARTS ...

Страница 2: ...ETY AREA 7 4 3 SAFETY INTEGRATED INTO THE MACHINE AND WORKING CYCLE 7 4 4 HAZARDOUS MATERIAL RESIDUES 7 4 5 PROTECTION MEASURES AGAINST RISKS DUE TO ELECTRICITY ONLY MOD GE 7 5 INSTALLATION AND WORKING 8 5 1 POSITIONING 9 5 2 STARTING THE MACHINE 9 5 3 WORKING 9 5 4 GE MODEL WITH ELECTRIC FLOAT 11 6 MAINTENANCE 13 6 1 ORDINARY MAINTENANCE ACTIVITIES GENERAL INFORMATION 13 6 2 ORDINARY MAINTENANCE ...

Страница 3: ...PEAN COMMUNITY LEGISLATION Instructions taken from the following have been used in composing this manual Reference Title Normative CEI 17 13 1 Concerning switchboards with low voltage type ANS Mod GE PE Directive 2004 108 EC Electromagnetic Compatibility EMC Directive Mod GE PE Reg EC n 1935 2004 Materials and objects in contact with food products Reg EC n 2023 2006 Good practice in the fabricatio...

Страница 4: ...ILLAN is not responsible for damage caused by using the machine for aims different than those indicated damage caused by unqualified personnel attempting to repair the machine ATTENTION with regards to some important European Directive norms that regulate safety at work THE PERSON RESPONSIBLE FOR SAFETY in the factory must check that the workers in charge of using the machine are capable of unders...

Страница 5: ...ICA PILLAN s r l guarantees that the machine was built in compliance with existing norms in particular those related to the health and safety or workers The product warranty lasts 12 months electrical parts are excluded from the warranty All expendable items are also excluded from the warranty The buyer has the right to substitute defective parts exclusively after confirmation has been made at our...

Страница 6: ...ling bottles with food liquids such as wine oil beer etc The Fillers are for indoor use All working operations must be carried out by one single operator It is FORBIDDEN to use the Filler for 1 liquids of any type explosive inflammable corrosive etc 2 solid products 3 animal products 4 any other use than that for which is was created ATTENTION EXPLOSIVE ENVIRONMENT This machine is not explosion pr...

Страница 7: ...is cleaning or performing maintenance on the machine do not perform any cleaning maintenance or disassembly operation without first disconnecting the machine from the electrical power network 4 3 SAFETY INTEGRATED INTO THE MACHINE AND WORKING CYCLE Working cycle The entire working cycle must be controlled by a single operator The operator is not exposed to risk if s he respects the intended use th...

Страница 8: ...hines which could irreparably damage it do not rest the cable on wet or muddy ground the interrupters outlets or plugs upstream from the plugs provided with the machine should have an adequate degree of protection check that the data on the plate of the machine corresponds with the data of the power supply network check that the electrical power supply device upstream from the machine is equipped ...

Страница 9: ...le to be used you have to adapt the filler by moving up or down the bottle holder 1 by hooking it to the sequence of cracks on the front of the legs of the filler The final level of the liquid in the bottle can be varied by adjusting the spacer 2 located above the rubber sealing cone 3 placed on each nozzle 4 5 3 WORKING The working is simple and it is based on the principle of communicating vases...

Страница 10: ...zle 4 which will close preventing the discharge of the liquid As the product decreases inside the tank the level will be restored in different ways depending on the machine versions N WITHOUT FLOAT the level of liquid in the tank will be kept constant by manual regulation of the loading valve GS WITH BALL FLOAT the level of liquid in the tank will be kept constant automatically by the float connec...

Страница 11: ...off automatically 5 4 1 Start up To start up you have to follow these steps 1 connect the power source cable A to the electricity grid according to the data plate located on the label 2 turn the switch off I on position 1 to give power to the switchboard white light T on 3 at this point the pump will be controlled automatically by the probes depending on the liquid level inside the tank green ligh...

Страница 12: ...ds type ANS In case of Three Phase Switchboard see diagram attached aside IT S FORBIDDEN Perform any work on the electrical devices In particolar it s forbidden open the switchboards and work on devices placed inside them remove the protections of the energy voltage parts and or disconnect electrical devices remove connectors covers of electrical devices etc ...

Страница 13: ... maintenance according to condition Ordinary programmed periodic or preventative maintenance includes inspections controls and interventions which to prevent stops and malfunctions keep the mechanical conditions of the machine and in particular its operations under systematic control Ordinary maintenance according to condition refers to the components of the machine for which wear times or interve...

Страница 14: ...E PARTS To have the machine operate correctly it is recommended that original spare parts supplied by the manufacturer are always used Standard Version TAV I II III GS Version TAV IV 1 Frame S2 Probe compartment MIN 30 Ball float 2 Omega frame 18 OR 18x3 55 NBR 31 Ball ring nut 3 Bottle holder 19 Inner spout journal box 32 Curve MF 4 Cover 20 Spout washer 33 Loading connection GS 5 Knob 21 Spout s...

Страница 15: ...Filler BACCO 15 TAV I ...

Страница 16: ...Filler BACCO 16 TAV II ...

Страница 17: ...Filler BACCO 17 TAV III TAV IV ...

Страница 18: ...isposal of materials must be made according to the rules applicable to the product type 9 GENERAL SALES CONDITIONS TRANSPORTATION Responsibility of the buyer CLAIMS Claims will not be accepted if more than eight days have passed since receiving the goods and returns are not accepted without our prior authorization RISERVE We are not responsible for any damages resulting from unintended use Further...

Страница 19: ...08 CE AND SUBSEQUENT AMENDMENT DIRETTIVA BASSA TENSIONE 2006 95 CE E SUCC EMENDAMENTI LOW VOLTAGE DIRECTIVE 2006 95 CE AND SUBSEQUENT AMENDMENT REGOLAMENTO CE n 1935 2004 MATERIALI ED OGGETTI DESTINATI A VENIRE A CONTATTO CON I PRODOTTI ALIMENTARI REGULATION CE n 1935 2004 MATERIALS AND OBJECT IN CONTACT WITH FOOD PRODUCTIONS REGOLAMENTO CE n 2023 2006 BUONE PRATICHE DI FABBRICAZIONE DEGLI OGGETTI...

Страница 20: ...ENOTECNICA PILLAN srl Via Chiesa R 4 6 36043 Camisano Vic VI Italy Tel 39 0444 719004 Fax 39 0444 719044 Web site www enotecnicapillan it E mail info enotecnicapillan it ...

Отзывы: