background image

ACTIVATION AND PRINCIPLE OF OPERATION CONTD

6. The heater does not require any maintenance or care during operation.

    Should it be necessary, wipe the device with a damp cloth.

instr. 

,EN-6

GV,11,21

TECHNICAL PAREMETERS OF HEATERS 

ENVIRONMENT PROTECTION

When the working life of the device has expired, do not dispose of 

it in the same place as other household waste. 

The  user  is  obliged  to  return  the  device  to  the  collecting 

centres  that  collect  used-up  electronic  and  electric 

equipment. 

Improper utilisation may result in hazard to the environment and human 

health. 

The  centres  that  collect  such  equipment,  including  local  collecting  and 

municipal centres, constitute the proper system, intended for the collecting 

of such equipment. 

instr. GV,11.21.EN-4

instr. 

, EN-5

GV,11.21

STRUCTURE

1

2

3

4

5

6

7

S=22

8

11

1.Termoregulator

   enclosure

2.Connection

   cable
3.Connection

   plug
4.Control

   hand-wheel

5.Optical indicator

   /button (only for GV, GVCh)
6.Heating element
7.Sensor guard
8.Plug for special coupling
9.Seat for special coupling

10.Interlocking screw

10

9

11.Coupling guard

ASSEMBLY

ATTENTION: it is possible to install the radiator with an electric 

heater in zone III (more than 60cm), exceeding the overall 

dimensions of a shower or tub (NEVER OVER THE TUB OR 

INSIDE THE SHOWER CUBICLE!)

DANGER: do not connect the thermoregulator unit to 

the mains, before the installation process has been 

completed!

ASSEMBLY CONTD

1. Use the open-ended spanner no.22 to screw the heating element to the 

connection opening in the vertical collector of the radiator.

2. Remove the shield (12) from the end of the heating element and slide the 

regulator completely over the plug of the special coupling (8), thus 

enabling the fitting of the pins of the plug into the appropriate indentations 

inside the special seat (9).

3. Determine the position of the enclosure, in relation to the radiator, and lock

    the enclosure, using a set screw (10).

4. Fill the radiator with water.

ACTIVATION AND PRINCIPLE OF OPERATION

2. If the radiator has been connected to the central heating system 

in such a way that the supply water (hot water from the boiler) 

enters the radiator from the top (the connection on the top ferrule 

on the radiator's collector), close one of the valves on the 

return/feed line of the radiator. 

1. ATTENTION! Make sure that the radiator is filled with water.

 

ATTENTION! Never close both valves at the same time.

Now the radiator can be filled with water. All other assembly activities 

can be carried out, after having completed all finishing work in the 

bathroom.

GV-300, GVCh-300

GV-600, GVCh-600

GV-900, GVCh-900

POWER

OUTPUT

230V   50Hz

~

230V   50Hz

~

230V   50Hz

~

300W

600W

900W

Insulation class: I (requires an earthing circuit), IP54

3. Connect the connection plug (3) to the power outlet that has an earthing

    bolt. Supply voltage: 230V, 50Hz. 
At start-up, the device measures the temperature and activates the heating 

element, depending on the results of the measurement and comparison with 

the required temperature.
4. Set expected temperature using the hand-wheel (4).

If the temperature value set by the hand-wheel (4) 

has been achieved, the heating element is 

deactivated and the diode (5) turned off. 

If the set temperature is higher than the measured 

temperature, the heating element is activated and 

the diode (5) lights up in red. 

+

-

set the 

temperature

Connect the plug
to the socket and

 

Press for
0.5 s 

 

Do not use
hand-wheel

The activation of the 2-hour mode is signalled by 

the flashing of the diode (5).

Repeated pressing and holding of the button for 

3 seconds cancels the command. 

5. 

Point 5 refers to the heaters of the GV and GVCh type, exclusively. 

The pressing of the button (5) activates the heater for 2 hours, regardless 

of the hand-wheel settings. After 2 hours, the heater returns to the normal 

working mode (see point 4).

Prior to the commencement of installation work, it is 

required to study this instruction carefully. All actions 

are to be carried out with care. Do not alter the 

sequence of installation activities. 

Screw tight delicately and carefully without exceeding the

maximal torque amounting 0,3 Nm.

Отзывы: