![Englefield QUICK-FIT SHOWER TRAY Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/englefield/quick-fit-shower-tray/quick-fit-shower-tray_installation-instructions_2413130004.webp)
INSTALLATION INSTRUCTIONS
QUICK-FIT SHOWER TRAY
INSTALLATION - SHOWER TRAY
Many tradesmen prefer to install trays on a weak cement slurry (approx. 10:1 sand and cement) thus
ensuring complete support over the entire load-bearing area. However this step is not necessary providing
that installation is on a flat, level surface free of bumps and protrusions.
When installed on a concrete slab floor, chases or channels left for plumbing must be completely backfilled.
Building requirements can vary, local regulations must be checked prior to installation.
-4-
A) CEMENT SLURRY
1) With the tray laying upside down, apply a
suitable adhesive
, such as Sika Nailbond
PB, to the bottom edges of all feet and the
bottom edge along the front of the tray.
2) Carefully turn tray over and place into position.
Ensure that the tray is level.
3)
Leave the tray in place, do not stand or walk on it for
24 hours to allow enough time for adhesive to cure.
B) CONSTRUCTION ADHESIVE
•Shower tray must be installed level!
•Tray must be fully supported!
!
IMPORTANT
Failure to comply voids warranty.
CONTACT AND WARRANTY INFORMATION
INSTALLATION - SHOWER WASTE
NEW ZEALAND
KOHLER NZ LTD
www.englefield.co.nz
AUSTRALIA
KOHLER AUSTRALIA
www.englefield.com
- For warranty and other information, please visit our website.
- For contact information, please refer to the Home Owner’s Guide.
I
nstall shower waste. Follow instructions supplied with the waste.
INSTALLATION - ENGLEFIELD DURACRYL WALL
I
nstall wall if applicable. Follow instructions supplied with the wall.
®
Bottom edge
of all feet
Bottom edge along
the front of tray
®
!
NOTE
Sika Showerbond is not recommended.
Cartridges from ENGLEFIELD adhesive/sealant
packs must not be used for this purpose.
®