Enertech XT024 Скачать руководство пользователя страница 34

34

Enertech Global

IOM, XT Models

NOTE: Supply voltage, amperage, fuse and 

disconnect switch sizes MUST conform with all 

technical specifications in this manual and on the 

unit rating plate.
1.  Permanently ground the electric heat accessory 

in accordance with local codes and ordinances 
and in the United States with National Electrical 
Code ANSI/NFPA70-2008 or current edition. 
Use a copper conductor of the appropriate 
size from the electric heat accessory ground 
lug, to a grounding lug on the circuit breaker 
panel. On models with more than one circuit, 
a separate copper ground wire MUST be 
connected for each circuit. Install top front door 
panel.

2.  The time delay module stages the heater 

elements for 15kW and 20kW heaters. In most 
cases, the time adjustment knob should be 
turned all the way to the right, providng 
approximately 10 minutes of delay between the 
first and second stage of electric heat. 

3.  Airflow requirements are different between 

models. Please refer to the unit Installation 
Instructions for airflow set-up information.

4.  Temperature rise is the difference between 

the supply and return air temperatures.

NOTE: The maximum outlet air temperature for all 
models is 200 Degrees F (93.3 Degree C).

NOTE: Supply voltage, amperage, fuse and 
disconnect switch sizes MUST conform with all 
technical specifications in this manual and on the 
unit rating plate.

⚠ 

WARNING 

ELECTRICAL SHOCK HAZARD

THE UNIT CABINET MUST HAVE AN 

UNINTERRUPTED OR UNBROKEN GROUND TO 

MINIMIZE PERSONAL INJURY IF AN ELECTRICAL 

FAULT SHOULD OCCUR. THE GROUND MAY 

CONSIST OF ELECTRICAL WIRE OR METAL 

CONDUIT WHEN INSTALLED WITH EXISTING 

ELECTRICAL CODES.

Section 7: Auxiliary Heater Installation

Heater Installation

1.  Shut OFF electrical power at unit disconnect 

switch or service panel.

2.  Remove the upper front panel from unit. Locate 

and remove the blank filler plate from the 
internal discharge plenum. 

3.  If unit is going to be used for right hand return 

the circuit breakers will have to be removed 
and rotated 180 degrees, so the OFF position 
will be DOWN when the cabinet is positioned 
on the right side. This is an NEC requirement. DO 
ONE BREAKER AT A TIME to make sure wires are 
reconnected properly. Loosen terminal screws 
on the wires. Gently pull wires back from breaker. 
Remove screws securing the breaker and 
rotate 180 degrees, then reconnect the wires to 
breaker. Proper torque for terminal screws is 35 
inch pounds.

4.  Insert the heater into the cabinet opening as 

shown in Figure 1. YT models do not have the 

back side plenum bracket previously used on 

XT and CT models. Exercise caution to prevent 
damage to heater element. 

5.  Secure the electric heat accessory with 

four screws. 

6.  Connect the 6-Pin heater wiring harness to 

the receptacle located inside the cabinet 
(Top Cover). A perfect match and positive 
connection must be made between the plug 
and receptacle. The plug will interlock with 
receptacle when properly seated. Harness 
contains 24 Volts wiring.

7.  Route unit power supply through knockout in top 

of unit and connect to line side of disconnect. 
Connect ground wire to ground lug. See wiring 
diagram label to make connections. All line 
voltage connections and ground connections 
MUST be made with copper wire. The power 
supply wiring MUST have overcurrent protection. 
This can be either fuses or circuit breakers. The 
maximum size for the overcurrent protection is 
shown in the column labeled “Max. Fuse or NEC 
HACR Breaker (Amps)” in the electrical Data 
Table or on the unit rating plate. Connect supply 
voltage wires to the Circuit Breakers on the 
heater or to the terminal block on the heater.

Содержание XT024

Страница 1: ...Installation OperationsManual XT MODELS PACKAGED WATER TO AIR MULTI POSITIONAL HEAT PUMPS 20D218 03NN 20D218 03NN Revision A...

Страница 2: ...Water Quality Guidelines 14 Interior Piping 15 Typical Pressurized Flow Center Installation 15 Typical Non Pressurized Flow Center Installation 16 Pressurized Flow Center and Pump Mounting 17 Condens...

Страница 3: ...kout with Emergency Heat 39 Lockout Board LED Identification 39 Sequence of Operation 40 Section 10 Wiring Diagrams Two Stage ECM Single Phase 208 230V 60HZ 41 Two Stage ECM Three Phase 208 230V 60HZ...

Страница 4: ...ures Part Load 41 F heating 68 F cooling AHRI Performance Data Btu hr COP Btu hr EER Full Load 19 800 4 3 27 200 20 3 Part Load 16 600 4 8 21 400 29 1 Full Load 29 200 4 2 38 900 18 3 Part Load 23 200...

Страница 5: ...ging Enertech units are mounted to wooden pallets for easy handling during shipment and installation Units are protected during shipment with durable cardboard corner posts top and air coil panels Shr...

Страница 6: ...amiliar with unit components and operation Thoroughly check the unit before operating 6 Determine discharge and return air patterns prior to unit assembly and installation Section 2 Installation Intro...

Страница 7: ...turer s recommendations The National Electrical Code and all local codes and ordinances Section 3 Installation Considerations Thermostat Thermostats should be installed approximately 54 inches off the...

Страница 8: ...equivalent to prevent transfer of vibration noise to the ductwork The flex connector should be designed so as not to restrict airflow Turning vanes should be used on any transition with airflow over 5...

Страница 9: ...tion and remove any packaging material or documentation included in the unit Maintain the installation instructions included with any kits for installation during unit assembly Remove and discard any...

Страница 10: ...l CSP Compressor Service Panel CAP Control Access Panel ASP Access Service Panel FPT Female Pipe Thread Top View Top Discharge 8 12 16 00 32 20 16 00 28 01 30 33 Control Box AIR COIL SIDE Front Back V...

Страница 11: ...1750 1235 1490 800 ON OFF OFF OFF ON OFF OFF OFF D 1300 1500 1300 1550 725 ON OFF OFF ON ON OFF OFF OFF 072 A B 1850 2100 1750 2150 1490 1830 1075 OFF OFF ON OFF OFF OFF OFF OFF C 1650 2000 1600 1900...

Страница 12: ...1 3 460 3 38 0 5 7 3 9 N A N A 9 6 11 0 15 14 67 048 1 208 230 1 104 0 21 2 5 2 0 5 5 5 32 4 37 7 50 8 79 0 208 230 1 104 0 21 2 5 2 N A N A 26 4 31 7 50 8 97 2 208 230 3 83 1 14 0 5 2 N A N A 19 2 22...

Страница 13: ...rt the unit to downflow supply air 1 Remove the screws holding the blower and heater housing and drop the assembly down 2 Remove the block off plate from the area under the blower housing on the botto...

Страница 14: ...he heat exchanger and corrosion of the internal parts are two of the potential problems The Department of Natural Resources or your local municipality can direct you to the proper testing agency Pleas...

Страница 15: ...rcial earth loops that require a flow rate of no more than 20 gpm 1 1 4 fusion x 1 double o ring fittings AGA6PES are furnished with the double o ring flow centers for HDPE loop constructions Various...

Страница 16: ...flushed with a purge cart The non pressurized flow center needs to be isolated from the flush cart during flushing because the flow center is not designed to handle pressure Since this is a non pressu...

Страница 17: ...ump will occur when the pump is not in the important to pump is terminal and proper control pump terminal must located in a to running into the control and also to the designed to drain any that may a...

Страница 18: ...n on installing EZ Trap see installationsheet that comes with the EZ Trap Kit Always install the air vent after the trap Note Connect the drain through the trap to the condensation drain system in con...

Страница 19: ...oved from the system before operation or pump failure could result The flush ports located on the flow center are access to the piping system for the flush cart See figure 7 for connection details The...

Страница 20: ...ctions Figure 8 Flow Center 3 Way Valves Flush Port Flush Port Flush Port Flush Port Loop Loop Loop Loop Unit Unit Unit Unit Section 5 Unit Piping Installation 1 Once the water level stays above the T...

Страница 21: ...ed 100 psi under any circumstance 9 Turn the 3 way valves on the flow center back to the normal operation mode which closes the flush port connections 10 Open the ball valves on the flush cart to reli...

Страница 22: ...erials Stability Will the brine require periodic change out or maintenance Convenience Is the antifreeze available and easy to transport and install Codes Will the brine meet local and state provincia...

Страница 23: ...tilled water with their products Antifreeze Charging Calculate the total amount of pipe in the system and use Table 4 to calculate the amount of volume for each specific section of the system Add the...

Страница 24: ...utions recommend the use of de ionized water Tap water may include chemicals that could react with the antifreeze solution Type of Antifreeze Minimum Temperature for Freeze Protection 10 F 12 2 C 15 F...

Страница 25: ...air coil Source Out Source In P T Ports P T Ports air coil Source Out Source In P T Ports Shut Off Valves Shut Off Valves Equipment Pad 2 Polyethylene Foam Equipment Pad 2 Polyethylene Foam Flow Cent...

Страница 26: ...ce the system is completed to avoid nuisance service calls Hose kits are optional but make for an easier installation since the P T ports and connections are included The hose also helps to isolate th...

Страница 27: ...27 IOM XT Models Enertech Global Open Loop Single Stage Solenoid Connections 2nd STAGE Open Loop Two Stage Solenoid Connections Section 5 Unit Piping Installation...

Страница 28: ...Plumbing Installation NOTE All plumbing and piping connections must comply with local plumbing codes Note Copper is the only approved material for desuperheater piping TIP Measure the distance above...

Страница 29: ...close to the tee in the cold water line Open the air vent and all shut off valves installed in the hot water hot 15 Turn the water supply to the water heater on Fill water heater Open highest hot wate...

Страница 30: ...es Drain Valve HWG In HWG Out Hot Water Out Hot Water In 3 4 Copper Adapter Fitting Unit Water Connection Detail Air Coil Air Vent Located at System High Point Cold Water Supply Hot Water Water Heater...

Страница 31: ...a potentially hazardous situation or an unsafe practice which if not avoided COULD result in minor or moderate injury or product or property damage WARNING Indicates potentially hazardous situation wh...

Страница 32: ...ctric heat accessories The installation instructions list the possible combinations and other important electrical data and limitations Note AHTR electric heaters are not backward compatible Inspectio...

Страница 33: ...ERSONAL INJURY OR DEATH BEFORE INSTALLING MODIFYING OR SERVICING SYSTEM MAIN ELECTRICAL DISCONNECT SWITCH MUST BE IN THE OFF POSITION THERE MAY BE MORE THAN ONE DISCONNECT SWITCH LOCK OUT AND TAG SWIT...

Страница 34: ...1 Shut OFF electrical power at unit disconnect switch or service panel 2 Remove the upper front panel from unit Locate and remove the blank filler plate from the internal discharge plenum 3 If unit is...

Страница 35: ...3 60 10 208 230 1 152 9 27 1 6 9 0 0 5 5 39 5 46 3 70 11 208 230 1 152 9 27 1 6 9 0 5 5 5 40 0 46 8 70 20 208 230 3 110 0 16 5 6 9 0 0 0 0 23 4 27 5 40 21 208 230 3 110 0 16 5 6 9 0 5 0 0 23 9 28 0 45...

Страница 36: ...g do not PART PART NAME designer E Parts List QTY DESCRIPTION PART NUMBER ITEM 1 BOX CONTROL PLATE GALVANIZED 13P005 01HN 1 1 BOX CONTROL DIVIDER GALVANIZED 13P004 01HN 2 1 PLATE TERMINAL STRIP CONTRO...

Страница 37: ...shorten most timing delays for faster diagnostics by changing the position of a jumper located on the lockout board Water Solenoid Valve Connections Two accessory relay outputs at the terminal strip p...

Страница 38: ...rd fault within 30 minutes the board will go into lockout mode and the Call For Service indicator on the thermostat will illuminate Intelligent Lockout Reset If the thermostat is powered off then back...

Страница 39: ...er is installed the A terminal is energized 10 seconds before the compressor is energized When the jumper is removed the A terminal is energized with the compressor If using a water solenoid valve wit...

Страница 40: ...n is started immediately at 75 of 1st stage operation CFM level based on DIP switch settings first stage compressor and the loop desuperheater pump s are energized 10 seconds after the Y1 input is rec...

Страница 41: ...41 IOM XT Models Enertech Global Section 10 Wiring Diagrams Two Stage ECM Single Phase 208 230V 60HZ...

Страница 42: ...42 Enertech Global IOM XT Models Section 10 Wiring Diagrams Two Stage ECM Three Phase 208 230V 60HZ...

Страница 43: ...43 IOM XT Models Enertech Global Section 10 Wiring Diagrams Two Stage ECM Single Phase 460V 60HZ...

Страница 44: ...water temperature in and out at the P T ports use insertion probe Allow 10 minutes of operation before recording temperature drop 6 Calculate the heat of extraction or heat of rejection Plumbing Pipe...

Страница 45: ...e Out Source Water Pressure Drop F F F F F F Heat of Rejection Extraction BTU HR BTU HR F F F F F F Cooling Heating F F F F F F Heating F F F Heating V A GA A Source Water Temp Difference Cooling Heat...

Страница 46: ...ion is recorded find corresponding entering water temperature column in Specification Manual for unit Find pressure differential in PSI column in Spec Manual Then read the GPM column in Spec Manual to...

Страница 47: ...to make the project easier to complete ECM Temporary Motor Replacement ECM Motor Troubleshooting Troubleshooting a TXV Compressor Troubleshooting Variable Speed Flow Centers Return Conversion for and...

Страница 48: ...ontactor operation See Note A No Yes OK Single Phase 208 230 C Line Winding R Run Winding S Start Winding R efer to th e com pressor w on t start flow chart Is the c om pre ssor run ning N o O K S hut...

Страница 49: ...switch for a couple seconds If compressor runs properly check switch If defective replace If switch is not defective check for air in loop system Make sure loop system is properly purged Verify flow r...

Страница 50: ...versing valve wiring If wired wrong correct wiring If reversing valve is stuck replace valve Wrap the valve with a wet cloth and direct the heat away from the valve Excessive heat can damage the valve...

Страница 51: ...discharge line always disconnect during troubleshooting Source loop IN Source loop OUT F psi F psi Return Air F Supply Air F GPM Customer Job Name ____________________________________________ Date ___...

Страница 52: ...sizing should be evaluated by the electric utility provider Proper Power Supply Evaluation CAUTION CHECK COMPRESSOR AMP DRAW TO VERIFY COMPRESSOR ROTATION ON THREE PHASE UNITS COMPARE AGAINST UNIT EL...

Страница 53: ...__________________________ City _____________________________State Prov __________ Email ___________________________________________ Application Residential New Construction Residential Geo Replacemen...

Страница 54: ...tter Ifdifferent than company OTHER NOTES _______________________________________________________________________________ ______________________________________________________________________________...

Страница 55: ...55 IOM XT Models Enertech Global This Page Intentionally Left Blank...

Страница 56: ...formation please visit our website or contact our Customer Service department at info enertechgeo com Statements and other information contained herein are not express warranties and do not form the b...

Отзывы: