
4
Enertech Global
IOM, WD Models
Section 2: Installation Introduction
Introduction
This geothermal heat pump provides heated water and chilled
water as well as optional domestic water heating capability.
Engineering and quality control is built into every geothermal
unit. Good performance depends on proper application and
correct installation.
Notices, Cautions, Warnings, & Dangers:
“NOTICE” Notification of installation, operation or
maintenance information which is important, but which is NOT
hazard-related.
“CAUTION” Indicates a potentially hazardous situation or an
unsafe practice which, if not avoided, COULD result in minor or
moderate injury or product or property damage.
“WARNING” Indicates potentially hazardous situation which, if
not avoided, COULD result in death or serious injury.
“DANGER” Indicates an immediate hazardous situation which,
if not avoided, WILL result in death or serious injury.
Inspection
Upon receipt of any geothermal equipment, carefully check
the shipment against the packing slip and the freight company
bill of lading. Verify that all units and packages have been
received. Inspect the packaging of each package and each unit
for damages. Insure that the carrier makes proper notation of
all damages or shortage on all bill of lading papers. Concealed
damage should be reported to the freight company within 15
days. If not filed within 15 days the freight company can deny
all claims.
Note: Notify Enertech Global, LLC shipping department of all
damages within 15 days. It is the responsibility of the purchaser
to file all necessary claims with the freight company.
Un-packaging
Enertech units are mounted to wooden pallets for easy
handling during shipment and installation. Units are protected
during shipment with durable cardboard corner posts, top and
air coil panels. Shrink wrap is applied covering the entire unit
and attachment to the pallet.
Upon receipt of the unit carefully remove the shrink wrap.
Using a box cutter slit the shrink wrap on the cardboard top
and corner posts. Use caution to not damaged the finished
surface of the unit. Keep all cardboard or other packaging
material for safe storage and transport to the job site prior to
installation.
Remove the front compressor section service panel to locate
technical documents; manuals, bulletins or instructions and
accessory items; HWG piping kits, supply/return duct flange
kits or condensate tubing kits prior to installation.
⚠
CAUTION
⚠
Do not operate the geothermal heat pump unit during
building construction phase.
Unit Protection
Protect units from damage and contamination due to
plastering (spraying), painting and all other foreign materials
that may be used at the job site. Keep all units covered on
the job site with either the original packaging or equivalent
protective covering. Cap or recap unit connections and all
piping until unit is installed. Precautions must be taken to
avoid physical damage and contamination which may prevent
proper start-up and may result in costly equipment repair.
Storage
All geothermal units should be stored inside in the original
packaging in a clean, dry location. Units should be stored in
an upright position at all times. Units should not be stacked
unless specially noted on the packaging.
Removal and Disposal
All Geothermal units removed from service should have
all components, oils, antifreeze and refrigerants properly
disposed of according to local and national environmental
recycling codes, regulations, standards and rules.
Pre-Installation
Special care should be taken in locating the geothermal unit.
Installation location chosen should include adequate service
clearance around the unit. If units are being placed on racking,
the unit must be placed on a solid foundation. All units should
be located in an indoor area where the ambient temperature
will remain above 55°F and should be located in a way that
piping and ductwork or other permanently installed fixtures do
not have to be removed for servicing and filter replacement.
Содержание WD240
Страница 18: ...18 Enertech Global IOM WD Models Section 8 Wiring Diagrams WD 240 Series Wiring Diagram...
Страница 19: ...19 IOM WD Models Enertech Global Section 8 Wiring Diagrams WD 360 Series Wiring Diagram...
Страница 31: ...31 IOM WD Models Enertech Global This Page Intentionally Left Blank...