Battery Installation, Operation and
Maintenance Instructions
Visit us at
www.enersys.com
16HX-FT
®
Страница 1: ...Battery Installation Operation and Maintenance Instructions Visit us at www enersys com 16HX FT...
Страница 2: ...up in a well ventilated area in accordance with local and national regulation Dispose of contents container in accordance with local and national regulation Keep out of reach of children BCI Warning...
Страница 3: ...pen circuit voltage after the battery has been at rest for a minimum of 24 hours at 77 F 25 C Refer to Table 2 for these approximations Table 1 DataSafe 16HX FT Battery Model Max Charging Current Amps...
Страница 4: ...rcell Connector Layout OPTIONAL Z TERMINAL ITEM 2 OPTIONAL INTERCALL CONNECTOR ITEM 1 Connectors and Z Terminals are RoHS compliant Batteries come standard with a stainless steel hardware package p n...