background image

Enersol Pool Panel Installation Guide                    

                                                                                         

 

15 | 

P a g e

 

 

MAINTENANCE AND 
TROUBLESHOOTING 

 

Header or Rubber Replacement 

 

Any  header  section  or  length  of  rubber  can  be 
replaced. To remove the rubber, push the rubber off 
with  a  flat  screwdriver.  Attach  tubes  to  the  headers 
by  simply  sliding  them  over  the  nipples.  Warm  the 
ends  of  the  tubes  in  hot  water  momentarily.  Push 
each  tube  on  until  it  contacts  the  header  and 
completely  covers  the  nipple.  No  clamps  are 
needed.  

 

 

 
Tube Repair 

 

Small  isolated  holes  a  splicer  can  be  inserted  to 
repair small isolated holes. 
 
For repair parts contact your Enersol Dealer or call  

1-800-884-6444 

 
 

 

 
 
 

 

If a Section Develops a Leak 

 

Allow 5 or 10 minutes for the O-ring to seat. Replace 
O-ring if marked, pinched, nicked or cut. Use O-ring 
lubricant as supplied.  

 
 

 

 
 

WINTERIZATION OF YOUR SOLAR 
SYSTEM 

Winterization must be done after your pool is closed.  

1) 

Go  to  the  highest  point  of  the  solar  panels 
and pipes and open the top corner end cap. 
Remove  the  opposite  bottom  corner  end 
cap.  Without  disturbing  the  top  and  bottom 
rows  of  headers,  work  your  way  along  the 
panels  and  gently  lift  the  rubber  from  top  to 
bottom.  If  in  doubt  you  can  open  a  section 
and  drain  out  excess  water.  Blowing  the 
lines  with a  shop-vac may  not  remove  all  of 
the water.  

2) 

Open all the end caps at down pipes, pump 
house  and  blow  any  underground  lines. 
Make sure that no water remains in any low 
pipes, sags in pipe valleys or any part of the 
system.  Reattach  the  end  cap  to  ensure 
nothing enters header.

 

3) 

Valves must be turned to be halfway open or 
closed.  On  motorized  valves,  turn  switch  to 

TEST 

and  let  valve  turn  halfway.  Pull  the 

electric cord. 

 
 

Содержание Pool Panel

Страница 1: ...1 800 884 6444 www enersol com April 2013 2013 Enerworks...

Страница 2: ...Enersol Pool Panel Installation Guide 2 P a g e...

Страница 3: ...and sales representatives of the Enersol solar products are in no way responsible if safety procedures installation instructions and common sense are not followed or if EnerWorks is not consulted sho...

Страница 4: ...for assistance at 1 800 884 6444 c Measure roof area available to be sure the panels will fit Panels must be positioned vertically from eave to peak with at least 6 space around the panels for plumbin...

Страница 5: ...r all components and tools required for the job TYPICAL PITCHED ROOF MOUNT Important Angle panel headers inch for e very 10 feet to drain water back to feed supply inlet Use chalk lines to reference a...

Страница 6: ...ber is not blocking any roof drainage TYPICAL GROUND MOUNT Support headers with 2x6 lumber Panels may be set on any material that will insulate them from the earth plywood metal plastic or gravel Note...

Страница 7: ...efully take the sections out of the box give each roll a twist to tighten and pick up from the bottom to prevent tangling set down evenly arrange and allow each section to unroll 3 Clip together using...

Страница 8: ...nt provided The last row nearest to the bottom should be no more than four inches from the bottom header Bottom headers are not strapped down to allow for expansion and contraction of the panels When...

Страница 9: ...ading FOR MALE END Remove O ring Cut locator tab off Apply transitional solvent cement liberally to both male and female surfaces Cement together FOR FEMALE END Cut a piece of 1 5 pipe to 3 long Apply...

Страница 10: ...t in the plumbing use a tee and end cap This will allow for drainage At any low points in plumbing use a tee and end cap to allow for drainage during winter months SYSTEM REGULATION OPTIONS 6 A valve...

Страница 11: ...ynchronize the valve handle by flipping the toggle switch at the bottom of the actuator between ON 1 and ON 2 to rotate the handle so it points to the solar panel feed line See full instructions for v...

Страница 12: ...essure test the system to test for leaks then let the cement set for 3 hours Turn your filter pump back on to get the water flowing Manual Valve Turn handle to divert water to the panels Automatic Val...

Страница 13: ...97 2 75 90 22 88 5 7 b Panel Array Size every component on a hydraulic system creates resistance or friction losses pool solar panels do not escape this reality care must be taken when determining the...

Страница 14: ...perating pressure for the solar panel is 15 PSI 120 F with a maximum fluid pressure of 17 PSI 120 F Recommended flow rate for the solar panels is 0 166 gallons per minute for every square feet of sola...

Страница 15: ...d pinched nicked or cut Use O ring lubricant as supplied WINTERIZATION OF YOUR SOLAR SYSTEM Winterization must be done after your pool is closed 1 Go to the highest point of the solar panels and pipes...

Страница 16: ...s of 150 F This prevents no circulating water from becoming stagnant and promoting bacterial growth The use of a drain down valve and end cap and a one way check valve is necessary Follow steps for Wi...

Страница 17: ...5 945163 6 55147 55 17 72 6 576353 4 784378 4 516246 4 777075 5 247546 5 616608 6 321604 7 036699 7 758862 60 20 65 7 65417 5 572497 5 313589 5 583597 6 135611 6 808544 7 37125 8 210722 9 057905 65 2...

Страница 18: ...11 48624 12 31443 13 58096 Number of Collectors 1 collector 4 sections of 1 ft each GPM Pressure Losses on PSI for 12 feet long Pool Collectors 1 2 3 4 5 6 7 8 9 10 4 ft 8 ft 12 ft 16 ft 20 ft 24 ft 2...

Отзывы: