background image

www.energy-ind.com

Please read this handbook carefully, before use

Gas Heater GH0618

Installation, Operation, Service and Maintenance Guide

GH 0618

 

The guarantee is considered in case of installation 

by a permissible agency of Energy company services.

Содержание GH 0618

Страница 1: ...e read this handbook carefully before use Gas Heater GH0618 Installation Operation Service and Maintenance Guide GH 0618 The guarantee is considered in case of installation by a permissible agency of...

Страница 2: ...fication 4 InstallationPreparation 7 VentpipeInstallationCondition 8 Differenttypesofheaterinstallationandoperation 9 ConnectiontoNaturalGasPiping 15 Prepurge postpurge 16 Heaterventilator 16 Electric...

Страница 3: ...cationofKeysandSignsonThermostatFrameandMonitor 19 TurningontheThermostat 20 revieweyelet 21 Limitcontrol 22 Wiringdiagram 23 Maintenance 24 Errorcodes 25 TechnicalSpecifications 26 Maximumhorizontalv...

Страница 4: ...9001 2008 Standard fromTUV NORD Credit source 3 All production stages are under supervision of the quality unit of Energy Company 1 The heater shall not be installed in the places with flammable air w...

Страница 5: ...ll not be less than 50 cm The system shall not be placed where it can be in the danger of mechanical or physical shocks unless there are some protecting pillars available In the mean time if the place...

Страница 6: ...121 square centimeters which is equal a vent with the dimensions of 110 110 mm and the status of the vents should be based on paragraph A Air entrances should supply an area the free surface should b...

Страница 7: ...pipe path should not be lower than vent pipe outdoor in any point 5 Please make sure that the vent pipe is not closed before installing the vent pipe 6 Please make sure that the vent pipe is connected...

Страница 8: ...s will be exited simply End of vent pipe should be equipped with the terminal and it should be at least 60 cm higher than the highest part of the building Before installation of the heater please anal...

Страница 9: ...nized To connect heater vent pipe to the vent output the coaxial converter should be used This part is directly connected to the heater vent output and it should be fixed by screw after the assurance...

Страница 10: ...the horizontal and vertical vent pipes status figure1 figure2 NOTICE Air supply vent at the place of installation of the heater should be in the dimen sions mentioned at general conditions vent pipe c...

Страница 11: ...11 Instructions Gas Heater GH0618 vent pipe standard terminal figure2 coaxial converter combustion air entrance...

Страница 12: ...d combustion products output Length of the coaxial pipe is 1 meter at maximum and if the heater is installed in this condition the coaxial vent pipe will be transferred by after the sale services depa...

Страница 13: ...ion output and if possible the minimum length in the piping system should be used according to the table3 Combustion air entrance Connect single wall vent pipe size 10 cm at entrance air pipe and scre...

Страница 14: ...er GH0618 NOTICE If the vent pipe and air entrance pipe are arparallel please make sure to install the vent pipe in the distance of 30 cm outer than air entrance pipe as shown above some kind of c32 c...

Страница 15: ...with heater which should be used at the gas valve output 3 Please input the hose to the head and fasten it 4 Open the gas valve and control the gas leakage with soap foam Warning The consuming fuel of...

Страница 16: ...ny gas resulted for 17 seconds The heater fan has an automatic operation Inbothmanualandautomaticstatus thermostatic isgoingtobeturnedon47secondsafterturningontheburnerandturnedoff 80secondsafterturni...

Страница 17: ...operated or used without thermostat remote control This heater is only capable to be installed to the attached thermostat Any connection of similar or different thermostat is prohibited Warning In ord...

Страница 18: ...mote control 4 By means of a small screwdriver push the thermostat door to the upside and open it 5 Pull the terminal out of its place fasten two cables in the terminal by a small screwdriver and loca...

Страница 19: ...igns onThermostat Frame and Monitor Increase set point decrease set point Determining the operation mode Summer manual thermostatic ON OFF Week days Environmental temperature set point Hour burner Sum...

Страница 20: ...ostat After you have turned the thermostat on press the Auto key to determine the heater operation mode Description monitor symbol Heater operation status Turn the heater on off without considering th...

Страница 21: ...f the flame is being assessed by the technician of Energy Co and if necessary after the opening of the exterior door the door with review gate and then the interior door set the valve capacity based o...

Страница 22: ...pressing the re operation key of limit control necessary studies for confirming the operation of fan motor and burner shall be run and if there is any problem in the operation of the system the after...

Страница 23: ...23 Instructions Gas Heater GH0618 Wiring diagram electricity wiring diagram...

Страница 24: ...piping path 2 Clean the exterior part of the system from pollution dust oil and foreign materials 3 Pull out the burner and clean the inshot burners Orifice and fan curtains with a soft brush 4 Clean...

Страница 25: ...re pre purge The heater is locked E02 Flame Return thermostat is disconnected Limit control thermostat is disconnected The heater is locked E09 To remove the errors after study and removal of the prob...

Страница 26: ...Gas Heater GH0618 Technical specifications natural gas N G energy source 18 Gas pressure mbar 1 9 Gas consumption m3 h 1 85 Orifice size mm 5 Orifice number 76 Length cm 60 Width cm 52 Height cm 45 W...

Страница 27: ...ximum horizontal vent lengths air enterance pipe vent pipe Type elbow quantity size cm elbow quantity size cm maximum lengths m maximum lengths m 4 3 2 1 10 B22 0 5 1 2 4 10 6 C12 4 3 2 1 10 4 3 2 1 1...

Страница 28: ...lami St Tehran Iran Telephone 9821 61444 Fax 9821 66701376 Factory After Fire station Baghershahr 7th Km Qom Road Tehran Iran Telephone 9821 61322233 Fax 9821 55202019 info energy ind com After sale s...

Отзывы: