3.3 Terminals Introduction

Item

Description

A

DC Switch (Optional)

B

PV1

C

PV2

D

PV3

E

WiFi/GPRS/4G/USB

F

Waterproof Lock Valve

G

Communication Port

H

AC Connector

I

Grounding Screw

Note: Only authorized personnel are permitted to set the connection.

3.4 Dimensions

Содержание Force 10.5S

Страница 1: ...Installer Manual This guide describes how to use and install Energizer Solar Inverters To prevent improper operation before use please carefully read this manual FORCE S SERIES GRID TIED INVERTERS...

Страница 2: ...AC Output 6 4 3 Efficiency Safety and Protection 7 4 4 General Data 7 5 Installation 8 5 1 Packing List 8 5 2 Preparation 8 5 3 Installation Space Required 9 5 4 Tools Required 9 5 5 Installation Ste...

Страница 3: ...appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situation whi...

Страница 4: ...y and shock hazards or equipment damage Before connecting the inverter to the power distribution grid contact the local power distribution grid company to get appropriate approvals This connection mus...

Страница 5: ...ypical of direct contact by people A higher threshold is used for slowly rising leakage currents to limit the current in grounding conductors for the safety The default value for higher speed personal...

Страница 6: ...he consumer s cutout located between the inverter and the meter distribution system SPD test impulse D1 for signal line according to EN 61632 1 All DC cables should be installed to provide as short a...

Страница 7: ...m Description A DC Switch Optional B PV1 C PV2 D PV3 E WiFi GPRS 4G USB F Waterproof Lock Valve G Communication Port H AC Connector I Grounding Screw Note Only authorized personnel are permitted to se...

Страница 8: ...18 18 18 Start up voltage V 120 120 120 120 120 No of MPP trackers 3 3 3 3 3 Strings per MPP tracker 1 1 1 1 1 Max Inverter backfeed current to the array mA 0 4 2 AC Output Model Energizer Force 7S E...

Страница 9: ...e Model Energizer Force 7S Energizer Force 8S Energizer Force 9S Energizer Force 10S Energizer Force 10 5S MPPT efficiency 99 00 99 00 99 00 99 00 99 00 Euro efficiency 97 40 97 40 97 40 97 40 97 40 M...

Страница 10: ...re the air flow around the inverter is not blocked Do not install in places where gas or flammable substances may be present Avoid electromagnetic interference that can compromise the correct operatio...

Страница 11: ...n Steps Step 1 Fix the bracket on the wall Choose the place you want to install the inverter Place the bracket on the wall and mark the position of the 3 holes from bracket Drill holes with electric d...

Страница 12: ...ected should be less than 600V and operating voltage should be within the MPPT voltage range Note Please choose a suitable external DC switch if the inverter does not have a built in DC switch Warning...

Страница 13: ...n contact by using a crimping plier Put the pin contact with striped cable into the corresponding crimping pliers and crimp the contact Insert pin contact through the cable nut to assemble into back o...

Страница 14: ...LD NOT be connected with the inverter directly Step 3 AC Wiring Check the grid voltage and compare with the permitted voltage range refer to technical data Disconnect the circuit breaker from all the...

Страница 15: ...nlock tool and pull it out or unscrew the threaded sleeve then pull it out 5 7 Earth Connection Screw the ground screw with screwdriver as shown below 5 8 Communication Device Installation This series...

Страница 16: ...refer to the WiFi product manual for more details 5 Set up the site account on the monitoring platform please refer to the monitoring user manual for more details Export limitation setting Short pres...

Страница 17: ...functionality To use this function a power meter or a CT must be installed For Meter installation please install it on the grid side DRM0 ESTOP Note For a precise reading and control of power a meter...

Страница 18: ...pport team to get the latest firmware and copy the files to U disk using the following file path Master Update master xxx_Master_Vx xx hex Slave Update slave xxx_Slave_Vx xx hex Manager Update manager...

Страница 19: ...and insert the monitoring device e T u r n on the DC switch or connect the PV connector to power on the inverter to finish the upgrade process Isolation Fault Australia Market Only This inverter comp...

Страница 20: ...voltage display will indicate the Waiting status and green LED will flash Checking Inverter will check DC input environment automatically when DC input voltage from the PV panels exceeds 120V and PV...

Страница 21: ...sword then press the button one time until it show Safety then long press the button to enter the option list Check Firmware version Region code and Power Quality Response Modes Please refer to the se...

Страница 22: ...er to the unit must be turned on only after installation work has been completed All electrical connections must be carried out by qualified personnel in accordance with legislation in force in the co...

Страница 23: ...he information of the inverter B Indicator LED Red The inverter is in fault mode C Green The inverter is in normal state D Touch Key The touch key is used to set the LCD to display different parameter...

Страница 24: ...ek help from us if it does not go back to normal state GFC Fault Disconnect DC and AC connector check the surrounding equipment on the AC side Reconnect the input connector and check the state of inve...

Страница 25: ...back to normal PLL Fault System will reconnect if the utility is back to normal Or seek help from us if it does not go back to normal state PV OVP Check the panel s open circuit voltage whether the va...

Страница 26: ...e Maintenance Safety check A safety check should be performed at least every 12 months by a qualified technician who has adequate training knowledge and practical experience to perform these tests The...

Страница 27: ...hat meets the following requirements Suitable for loads more than 30 kg Contains a handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures...

Страница 28: ...26...

Страница 29: ...3000 Australia 8 Star Energy ESS Limited The Black Church St Mary s Place Dublin DO7 P4AX Ireland Phone 61 1300 757 827 Email hello energizersolar com Website www energizersolar com 2022 Energizer En...

Отзывы: