![Energenie EG-PMS-LANU Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/energenie/eg-pms-lanu/eg-pms-lanu_user-manual_2409683011.webp)
11
EG-PMS-LANU ENERGENIE PROGRAMMABLE POWER
STRIP WITH LAN INTERFACE
All brands and logos are registered trademarks of their respective owners
represented by the corresponding indicator which will be lit if socket
has power to it.
If the
Main rocker switch
(Z) (see Figure #2 above) is turned off then
the manageable sockets cannot be switched on by either web server,
Power manager
software or the hardware schedule.
As soon as you turn the
Main rocker switch (Z)
on then the web
server,
Power manager
software or the hardware schedule will be
able to turn the manageable sockets on and off.
Master switch button (B)
(see Figure #1 above) can also switch all
the manageable sockets on and off regardless of their current status
or schedule that is being executed. To switch them on you should
keep the button pressed for 1-2 seconds. To switch them off you
should keep the button pressed for more than 3 seconds.
To protect the connected devices from possible high current and
short circuit EG-PMS-LANU is equipped with the automatic circuit
breaker.
NOTE:
If the total power consumption (or peak power) of the
devices, connected to EG-PMS-LANU exceeds 1650 Watts, the
circuit breaker (that built in master power switch) may power EG-
PMS-LANU off. In this case, please, remove the excessive load first,
wait about 2-3 minutes, and then press the Power switch button to
restore the power supply (see Figure #2 above).
To be able to use EG-PMS-LANU you will now have to complete its
LAN configuration.