Enerco MH125 Скачать руководство пользователя страница 4

OPERATING INSTRUCTIONS

WARNING

IF YOU DO NOT FOLLOW THESE INSTRUCTIONS 
EXACTLY, A FIRE OR EXPLOSION MAY RESULT 
CAUSING PROPERTY DAMAGE, PERSONAL 
INJURY, OR LOSS OF LIFE.

CAUTION

THIS APPLIANCE IS HOT DURING NORMAL 
OPERATION, AVOID PHYSICAL CONTACT.

CAUTION 

DO NOT PLACE CLOTHING OR OTHER 
COMBUSTIBLE MATERIALS ON THIS APPLIANCE.

DO NOT operate this heater if any part has been under 
water. 

Call a qualified service technician to inspect the appliance 

and to replace any part of the control system or gas control valve 
which has been under water.

This appliance must be installed and operated only in locations 
where the potential for physical damage to the appliance is 
reduced to a minimum. The owner/operator of this appliance 
must ensure that precautions are taken to protect the appliance 
from physical damage.

LIGHTING AND SHUT DOWN

Lighting the Heater

Before attempting to light the heater, smell all around 
the heater area for gas. Be sure to smell next to the 

¯oor 

because LP Gas is heavier than air and will settle on the 

soap and water solution. 

NEVER use a match to check 

for gas leaks.

 Should a gas leak occur, shut off the gas 

supply to the appliance immediately. Wait a minimum of 

Use only the fuel intended for this appliance. Check the 
appliance rating plate for the correct   fuel information.

Turn the gas valve knob clockwise to the “OFF” position. 
See Fig. 1 and Fig. 2 for location of appliance parts.

to allow gas which may have accumulated in burner 
compartment to escape.

Turn on the main gas supply.

6a  Depress and turn Control Knob counterclockwise to 

“Pilot” position and hold for 1-2 minutes. This may take 
longer to purge air from the supply hose depending on 
the length of the hose being used.

 

(repeat until pilot lights) and continue to hold Control 
Knob at “Pilot” positionfor 30-60 seconds to enable Pilot 
Light Safety System.

 

Fully turn Control Knob to “ON” position to light burner. 

or...

6b  To light the pilot, move the lighting hole cover aside 

(see Fig. 1) and place a lighted match into the hole. 
Depress the gas valve knob and hold while lighting 
and observing the pilot burner. Ensure that the pilot 
burner ignites from the match. Allow the pilot to burn 
approximately 30 seconds before releasing the gas valve 
knob. If pilot does not remain lighted, repeat the lighting 
operation allowing a longer period of time before 
releasing the gas valve knob.

NOTE: In cases where long runs of gas supply lines have been 
installed ahead of the appliance, it may be necessary to bleed 
trapped air out of the supply lines before lighting the pilot. 
New installations generally require bleed of supply lines. Wait 
a minimum of five minutes after bleeding the supply lines 
before attempting to light the heater.

Adjust pilot if necessary as noted under “Pilot Burner 
Adjustment.”

7.  Turn the gas valve knob counter-clockwise to the “ON” 

position (see Fig. 1). The burner will light. 

DO NOT 

operate the heater in any other than the full “ON” 
position.

8. 

IMPORTANT: DO NOT attempt to adjust the main 
burner input using the main gas supply valve,

 for 

this may cause the pilot and thermocouple to shut down 
the burner (Fig. 2).

Shut-down instructions:

To turn the heater OFF,

 

For short periods of time, turn the main burner off by 
rotating the gas valve knob clockwise to the “PILOT” 
position.

 

For extended periods of non use, turn the appliance 
completely off by rotating the gas valve knob clockwise 
to the “PILOT” position, depress the knob slightly, then 
rotate the knob fully clockwise to the “OFF” position. 
(Note: For Model 120L, also turn off the gas supply 
cylinder.)

Pilot burner adjustment:

1.  Remove the pilot adjustment cap. The pilot adjustment 

cap is a slotted screw located in front of  the “Pilot” 
designation stamped on top of valve body just below the 
gas valve knob.

2. 

Rotate the key “clockwise” to decrease or “counter-

3.  Replace the pilot adjustment cap.

4

Operating Instructions and Owner’s Manual

Enerco Group, Inc. | Gas-Fired Infra-Red Portable Construction Heater

Содержание MH125

Страница 1: ...IF YOU NEED ASSISTANCE OR HEATER INFORMATION SUCH AS INSTRUCTION MANUALS LABELS ETC CONTACT THE MANUFACTURER WARNING FIRE BURN INHALATION AND EXPLOSION HAZARD KEEP SOLID COMBUSTIBLES SUCH AS BUILDING...

Страница 2: ...ED AND MUST BE USED ONLY IN A WELL VENTILATED AREA The flow of combustion and ventilation air must not be obstructed DO NOT use in a tightly enclosed area Any combustion process requires and consumes...

Страница 3: ...supply system If connected to a self contained LP Gas supply system the hose assembly must be inspected prior to each use of the heater If it is evident that there is excessive abrasion or wear or if...

Страница 4: ...to ON position to light burner or 6b To light the pilot move the lighting hole cover aside see Fig 1 and place a lighted match into the hole Depress the gas valve knob and hold while lighting and obse...

Страница 5: ...ERATING OR WHILE IT IS STILL HOT Turn the heater off and wait until it has completely cooled at least 20 minutes before cleaning Clean the outside of the heater using a damp cloth DO NOT clean the hea...

Страница 6: ...13 6 23514 Pilot Burner 7 26255 Regulator 9 23515 Ignitor 10 20735 Piezo 11 23523 Axle With Brackets 12 23518 Wheel 13 23517 Handle 15 23519 Valve Supply Tube 16 23520 Valve Supply Tube Clamp 17 2352...

Страница 7: ...MH125LP 1 9 11 13 Combustion Chamber Mounting Bracket Pilot Supply Tube Propane Hose Top Plate Frame Assembly 7 Operating Instructions and Owner s Manual Enerco Group Inc Gas Fired Infra Red Portable...

Страница 8: ...any part for which a written claim is made to Enerco Group Inc within the time limit of this warranty which is returned upon request to Enerco Group Inc F O B Cleveland Ohio or F O B an Enerco Group I...

Страница 9: ...rantie est de remplacer ou de r parer toute pi ce d fectueuse pour laquelle une r clamation a t crite l attention d Enerco Group Inc et apr s qu Enerco Group Inc a confirm sa d fectuosit et ce dans la...

Страница 10: ...1 6 7 7 9 11 13 Chambre de combustion Support de fixation Tube d alimentation de la veilleuse Tuyau pour gaz propane Plateau sup rieur Structure 7 Enerco Group Inc Appareil de chauffage portatif infr...

Страница 11: ...3 6 23514 Br leur de la veilleuse 7 26255 R gulateur 9 23515 Allumeur 10 20735 Piezo 1 1 23523 Essieu 12 23518 Roue 13 23517 Poign e 15 23519 Le Tube de Provision de soupape 16 23520 Le Serre joint de...

Страница 12: ...u s il est coup remplacez le avant de mettre l appareil de chauffage en marche La tuyauterie de remplacement doit avoir t approuv e par le fabricant Voir la liste des pi ces de remplacement L espace e...

Страница 13: ...sez seulement le type de combustible pr vu pour le pr sent appareil de chauffage Consultez la plaque signal tique pour obtenir des informations sur le type de combustible utiliser 3 Faites tourner le...

Страница 14: ...pane liqu fi Ce mod le peut tre branch un syst me d alimentation autonome de gaz propane liqu fi l aide du tuyau et de l ensemble de r gulation fournis avec l appareil OU peut tre branch un syst me d...

Страница 15: ...N EXC DEZ PAS PSI 14 POUCES D EAU DE PRESSION LA VALVE D ADMISSION DU GAZ SP CIFICATIONS N O DE MOD LE MH125LP TYPE DE GAZ Gaz propane liqu fi l PRESSION D ADM MAX 14 PO D EAU PRESSION D ADM MIN 11 PO...

Страница 16: ...PR SENT APPAREIL COMME DES MODES D EMPLOI DES TIQUETTES ETC VEUILLEZ COMMUNIQUER AVEC LE FABRICANT MISE EN GARDE RISQUE D INCENDIE DE BR LURE D INHALATION DE SUBSTANCES TOXIQUES ET D EXPLOSION TEL QU...

Отзывы: