3.
Connection to the power grid
In the lower (bottom) part of the terminal there is
a contact to the powergrid, which divides electric
energy to two charging panels at the same time.
•
Pull out black plexi panel to get access to the
contact.
•
Connect wires from the contact to the
socket -
fig.11
Terminal must be earthed. Ensure, that
yellow-and-green wire is connected to the
working earhting contact!
Ensure, that wires to power grid have
proper diameter. It must be minimum
16mm
2
.
•
Insert (slide in) black plexi panels on each side of
the case.
4.
Charging panels installation
Charging panels have a safe connection
system with the powegrid through
a contact with a socket and a plug.
•
Before installing a charging panel, make sure that
a fuse and RCD are turned on (working)
•
Lift the panel and slide it in the rails of an alumin-
ium profile
fig.12
. If there are any difficulties in
sliding the panel in, put a drop of a thick grease
into each rail.
•
At the end of the sliding in, a plug on the panel will
get inside the socket in the case -
fig.13.
•
On the top, screw two screws to the case -
fig.20.
•
Repeat all above with the second charging panel.
The installation, commissioning and
maintenance of the charging station may only
be performed by correctly trained, qualified
and authorized electricians who are fully
responsible for the compliance with existing
standards and installation regulations.
Ensure that at all times when working,
no power is connected.
fig.11
phase 3
phase 2
phase1
neutral
earth
fig.13
fig.12
Installation manual ver. 1.6, © Enelion 05.2017