ProlineйPromagйDй400йHART
Commissioning
Hauser
69
10
Commissioning
10.1 Function check
Beforeйcommissioningйtheйdevice,йmakeйsureйthatйtheйpost-installationйandйpost-
connectionйchecksйhaveйbeenйperformed.
• "Post-installationйcheck"йchecklistйс ййй29)
• "Post-connectionйcheck"йchecklistйс ййй40)
10.2 Switching on the measuring device
Afterйaйsuccessfulйfunctionйcheck,йswitchйonйtheйmeasuringйdevice.
Afterйaйsuccessfulйstartup,йtheйlocalйdisplayйswitchesйautomaticallyйfromйtheйstartupйdisplay
toйtheйoperationalйdisplay.
Ifйnothingйappearsйonйtheйlocalйdisplayйorйaйdiagnosticйmessageйisйdisplayed,йreferйto
theйsectionйonй"Diagnosticsйandйtroubleshooting"йс ййй103).
10.3 Setting the operating language
Factoryйsetting:йEnglishйorйorderedйlocalйlanguage
X X X X
X X X
X
X
20.50
Operation
Setup
Main menu
0104-1
Language
English
Español
Français
Language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Language
English
Deutsch
0104-1
Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XX
XX
ййA0013996
20
Using the example of the local display
10.4 Configuring the measuring device
Theй
Setup
йmenuйwithйitsйguidedйwizardsйcontainsйallйtheйparametersйneededйforйstandard
operation.
Navigationйtoйtheй
Setup
йmenu
Содержание Proline Promag D 400 HART
Страница 172: ...www addresses endress com...