Liquiline System CA80SI
Commissioning
Hauser
43
9
Commissioning
Before the supply voltage is applied
On account of the device design, high switch-on currents occur when the device is
commissioned at low temperatures. The power value indicated on the nameplate refers to
the power consumption after one minute of operation when the device is commissioned at
5 °C (41 °F).
Activities while the analyzer is in operation
Risk of injury and infection from medium!
‣
Before you release any hoses, make sure that no actions, such as the pumping of
sample, are currently running or are due to start shortly.
‣
Wear protective clothing, goggles and gloves or take other suitable measures to protect
yourself.
‣
Wipe up any spilt reagent with a disposable tissue and rinse with clear water. Then dry
the cleaned areas with a cloth.
9.1
Preliminaries
9.1.1
Commissioning steps
When commissioning the device for the first time, the device must be rinsed with
process medium for a number of hours (recommended: 16 hours) so that a reliable
zero point calibration can be performed.
To commission, proceed as follows:
1. Mount the analyzer on a wall or on a base.
2. 1-/2-channel version: Mount pressure relief valve and filter with angle brackets.
3. 4-/6-channel version: Mount panel with pressure relief valves and filters.
4. 4-/6-channel version: Install the panel with sample channel switching.
5. Route the cable for sensor inputs and outputs.
6. Connect sample outlet hose "D".
7. Connect sample inlet hose "SPx". .
8. Connect outlet hose "W" (outflow from cuvette).
9. Place the magnetic stir bar in the measuring chamber of the cuvette.
10. Connect the power supply.
The measuring device switches on.
11. Perform basic configuration of measuring device.
12. Configure the sample flow.
13. Connect reagents and standard.
14. Start the measurement.
15. Attach cover in front of cuvette assembly.