CE 4
Operation
Hauser
13
4.4
Checking the connections
Once the measurement station has been electrically connected, run the following
checks:
5
Operation
!
Note!
The operation of individual components can be found in the respective operating
instructions in sections 5, 6, 7 and 8 in the ring binder.
5.1
Communication and data security
The measured data cables from individual measurement transmitter signals are wired
to the terminals in the electronic compartment as standard 4 - 20mA signals.
5.1.1
Data storage
For data logging, Hauser can offer a number of different recording and data
acquisition devices (e.g. Eco-Graph or Memo-Graph).
Fig. 8:
Recorders from Hauser for data storage in the CE 4 measurement station
Unit condition and specification
Hints
Are the measurement station or cables damaged ?
Visual check
Electrical connections
Does the power supply correspond with that on the legend plate?
See legend plate
Are all terminals tightly fixed in their correct position? Is the coding on
the individual terminal correct?
-
Are the power supply and signal cables correctly connected?
See connection schematic
for the station
Have all terminal screws been tightened?
-