
Technical description
Automatic Boat Drive
12
1
2
3
Figure 3 LED displays
1 "flame" LED indicator
2 "temp" LED indicator
3 "ready" LED indicator
3.1.4
Sample sluice with flap and injection port
The cooled sample sluice is used for feeding samples in horizontal operating mode.
Quartz glass boats (solids) filled with sample are transfered into the ABD by means of
the flap. Liquids are metered directly via the injection port of the flap into a quartz glass
boat. Gas and liquid gas samples are metered by means of a special cannula (gas meter-
ing module) through the injection port directly into the ABD connection piece. A quartz
glass boat is not required.
In addition, for liquids in the sample sluice, the used quartz glass boats are cooled to
room temperature after combustion (cooling time at least 200 s) to prepare them for
the next analysis.
The opening and closing of the sample sluice during measurement and the transport of
the quartz boat into the combustion tube is controlled via the multiWin control and
analysis software.
1
2
3
Figure 4 Sample sluice/injection port
1 Flap
2 injection port
3 Quartz boat with carrier material
3.1.5
ABD connection piece
The connection between the ABD and the combustion tube of the analyzer is estab-
lished via a connection piece with seals and screwed connection (see fig.).
The installation of the connection piece to the combustion tube of the analyzer is de-
scribed in chapter (→ "Connecting the ABD to the analyzer"
Содержание 450-126.416
Страница 1: ...Operating Manual Automatic Boat Drive...